{"api_version":"v1","resource":"facilities","count":30,"limit":25,"offset":0,"data_basis_legend":{"model":"Model/desk estimate — retains model status","company_reported":"Company-reported, not independently verified","verified":"Independently verified / government source","missing":"No sourced value — unknown, not zero"},"data":[{"slug":"gbn-agr-amsterdam","name":"GBN-AGR Amsterdam","operator_name":"Artificial Grass Recycling B.V. / GBN-AGR","owner_name":null,"country_slug":"netherlands","city":"Amsterdam","address":"Santoriniweg 20, 1045 AV Amsterdam, Netherlands","lat":52.4184998,"lng":4.7883115,"location_status":"company_confirmed_facility_location","geocoding_method":"OpenStreetMap Nominatim, house-number match on published street address","operational_status":"operational","accepted_streams":["sport"],"accepted_materials":["end-of-life synthetic turf (infill + carpet)"],"processes":["delivery to Amsterdam","infill removal / separation","washing / cleaning","turf carpet shredding","separation / cleaning","production of recycled turf agglomerate (RTA)"],"outputs":[{"stream":"Recycled sand","end_market":"reuse as infill; drainage sand","evidence":"company reported"},{"stream":"Recycled rubber","end_market":"industrial flooring; green-roof panels","evidence":"company reported"},{"stream":"Recycled turf agglomerate (RTA)","end_market":"plastic hockey edge boards; picnic-table components; sports-technical base layers; other recycled plastic products","evidence":"company reported"}],"capacity_licensed":null,"capacity_installed":"CURRENT 2026 CAPACITY: UNKNOWN — CONFLICTING PUBLIC CAPACITY CLAIMS. 2,000,000 m²/year — PUBLICLY REPORTED CAPACITY CLAIM (UBA; ≈70,000 t/year SOURCE-REPORTED MASS EQUIVALENT, not a CTE conversion, not throughput).","capacity_announced":null,"capacity_company_reported":"500,000 m²/year — ESTC 2023 INDUSTRY-REPORTED CAPACITY CLAIM.","verified_throughput":null,"capacity_label":"publicly reported","evidence_level":"company_reported","last_verified":"2026-09-28","translations":{"summary":{"en":"Founded in April 2019 by GBN together with turf producers; production started in spring 2021. Company-reported target for the first production year was 1.5 million metres of turf. No independently verified throughput was found. Acquired by RNW Capital in January 2025.","nl":"Opgericht in april 2019 door GBN met kunstgrasproducenten; productie startte in het voorjaar van 2021. Bedrijfsopgave voor het eerste productiejaar: 1,5 miljoen meter mat. Geen onafhankelijk geverifieerde verwerkte hoeveelheid gevonden. In januari 2025 overgenomen door RNW Capital."}},"updated_at":"2026-09-29T07:51:57.194079+00:00","processor_category":"fixed","data_basis":["company_reported"],"missing_fields":["owner_name","capacity_licensed","capacity_announced","verified_throughput"]},{"slug":"tuf-recycling-dongen","name":"TUF Recycling (Dongen)","operator_name":"TUF Recycling","owner_name":null,"country_slug":"netherlands","city":"Dongen","address":"Vierbundersweg, Tichelrijt, Dongen","lat":null,"lng":null,"location_status":"address_not_precise_enough","geocoding_method":null,"operational_status":"closed","accepted_streams":["sport"],"accepted_materials":["sand","sbr","backing"],"processes":["intake / storage","infill removal","turf carpet export for further processing"],"outputs":[{"stream":"Turf carpet","end_market":"exported to Belgium for further processing","evidence":"government study"}],"capacity_licensed":null,"capacity_installed":null,"capacity_announced":null,"capacity_company_reported":null,"verified_throughput":null,"capacity_label":"not recycling capacity","evidence_level":"government_source","last_verified":"2026-09-28","translations":{"summary":{"en":"Operated from 2015; separated infill from turf mats, cleaned mats went to a Belgian recycler. Repeated enforcement by the municipality of Dongen and inspections by Omgevingsdienst Midden- en West-Brabant. After a fire in October 2018 the site held around 10,000 tonnes of infill against a permitted 7,500 tonnes, plus around 13,000 tonnes of stacked turf. The site was cleared between May 2020 and the end of 2020.","nl":"Actief vanaf 2015; scheidde infill van matten, schone matten gingen naar een Belgische verwerker. Herhaalde handhaving door gemeente Dongen en inspecties door Omgevingsdienst Midden- en West-Brabant. Na de brand in oktober 2018 lag er circa 10.000 ton infill tegen een vergunde 7.500 ton, plus circa 13.000 ton gestapelde matten. Het terrein is tussen mei 2020 en eind 2020 opgeruimd."}},"updated_at":"2026-09-29T07:49:42.079774+00:00","processor_category":"historical","data_basis":["missing"],"missing_fields":["owner_name","lat","lng","geocoding_method","capacity_licensed","capacity_installed","capacity_announced","capacity_company_reported","verified_throughput"]},{"slug":"rematch-herning","name":"Herning synthetic-turf recovery site — Turf Recycling ApS (former Re-Match Herning)","operator_name":"Turf Recycling ApS (current operator); Re-Match A/S (historical operator)","owner_name":null,"country_slug":"denmark","city":"Herning","address":"HI-Park 415, 7400 Herning, Denmark","lat":56.133788,"lng":9.102593,"location_status":"official_facility_location_regulatory_address","geocoding_method":"regulatory address (DMA case 2388095)","operational_status":"operational","accepted_streams":["sport"],"accepted_materials":[],"processes":["downsizing","cleaning","separation"],"outputs":[{"stream":"sand · rubber · backing · plastic fibre","end_market":"UNKNOWN","evidence":"historical company description (Re-Match 2021 prospectus)"}],"capacity_licensed":null,"capacity_installed":null,"capacity_announced":null,"capacity_company_reported":null,"verified_throughput":null,"capacity_label":"CURRENT CAPACITY: UNKNOWN · CURRENT THROUGHPUT: UNKNOWN · Re-Match historical figures shown separately, not attached to Turf Recycling ApS","evidence_level":"company_reported","last_verified":"2026-09-29","translations":{"type":{"de":"AKTIVER KUNSTRASEN-VERARBEITER / VERWERTUNGSSTANDORT FÜR NICHT GEFÄHRLICHE ABFÄLLE (aktueller Betreiber Turf Recycling ApS; historischer Betreiber Re-Match A/S)","en":"ACTIVE SYNTHETIC-TURF PROCESSOR / NON-HAZARDOUS WASTE-RECOVERY SITE (current operator Turf Recycling ApS; historical operator Re-Match A/S)","fr":"SITE ACTIF DE TRAITEMENT DE GAZON SYNTHÉTIQUE / DE VALORISATION DE DÉCHETS NON DANGEREUX (exploitant actuel Turf Recycling ApS ; exploitant historique Re-Match A/S)","nl":"ACTIEVE KUNSTGRASVERWERKER / TERUGWINNINGSLOCATIE VOOR NIET-GEVAARLIJK AFVAL (huidige exploitant Turf Recycling ApS; historische exploitant Re-Match A/S)"},"summary":{"de":"Der frühere Re-Match-Betrieb in Herning wurde im Dezember 2024 eingestellt. Der physische Standort HI-Park 415 ist unter Turf Recycling ApS wieder aktiv. CTE hat den aktuellen Betreiber und die Abfallverwertungstätigkeit anhand dänischer Behördenregister verifiziert; die aktuelle Jahreskapazität und der Durchsatz bleiben UNBEKANNT. Zeitleiste — HISTORISCH: Re-Match A/S → Betrieb eingestellt Dezember 2024. AKTUELL: Turf Recycling ApS → 2026 aktiv am HI-Park 415 → behördliche Vor-Ort-Inspektion am 4. Juni 2026. Ein physischer Standort, zwei Betreiberzeiträume.","en":"The former Re-Match operation at Herning was discontinued in December 2024. The physical site at HI-Park 415 is active again under Turf Recycling ApS. CTE has verified the current operator and waste-recovery activity through Danish regulatory records; current annual capacity and throughput remain UNKNOWN. Timeline — HISTORICAL: Re-Match A/S → operations discontinued December 2024. CURRENT: Turf Recycling ApS → active at HI-Park 415 in 2026 → physical regulatory inspection 4 June 2026. One physical site, two operator periods.","fr":"L'ancienne activité de Re-Match à Herning a été arrêtée en décembre 2024. Le site physique de HI-Park 415 est de nouveau actif sous Turf Recycling ApS. CTE a vérifié l'exploitant actuel et l'activité de valorisation des déchets au moyen des registres réglementaires danois ; la capacité annuelle et le débit actuels restent INCONNUS. Chronologie — HISTORIQUE : Re-Match A/S → activité arrêtée en décembre 2024. ACTUEL : Turf Recycling ApS → actif à HI-Park 415 en 2026 → inspection réglementaire sur site le 4 juin 2026. Un seul site physique, deux périodes d'exploitation.","nl":"De voormalige Re-Match-activiteit in Herning is in december 2024 beëindigd. De fysieke locatie op HI-Park 415 is weer actief onder Turf Recycling ApS. CTE heeft de huidige exploitant en de afvalterugwinningsactiviteit geverifieerd via Deense overheidsregistraties; de huidige jaarlijkse capaciteit en verwerking blijven ONBEKEND. Tijdlijn — HISTORISCH: Re-Match A/S → activiteiten beëindigd december 2024. HUIDIG: Turf Recycling ApS → actief op HI-Park 415 in 2026 → fysieke inspectie door de toezichthouder op 4 juni 2026. Eén fysieke locatie, twee exploitatieperiodes."}},"updated_at":"2026-09-29T11:49:43.385938+00:00","processor_category":"fixed","data_basis":["missing"],"missing_fields":["owner_name","capacity_licensed","capacity_installed","capacity_announced","capacity_company_reported","verified_throughput"]},{"slug":"realsport-ch","name":"Realsport SA / AG — Swiss synthetic-turf processing / recycling route + reuse route","operator_name":"Realsport SA / AG","owner_name":null,"country_slug":"switzerland","city":null,"address":null,"lat":null,"lng":null,"location_status":"processing_in_switzerland_exact_site_not_verified","geocoding_method":null,"operational_status":"operational","accepted_streams":[],"accepted_materials":["end-of-life synthetic turf (mat + infill)","used turf rolls for reuse"],"processes":["sports-field audit","dismantling","infill separation","screening / sieving","primary shredding / size reduction","weighing and traceability recording","roll preparation and selection for reuse"],"outputs":[{"stream":"facility_type","end_market":"ACTIVE SYNTHETIC-TURF PROCESSING / RECYCLING ROUTE + ACTIVE REUSE ROUTE — EXACT FACILITY LOCATION NOT YET VERIFIED (COMPANY-REPORTED)","evidence":null}],"capacity_licensed":null,"capacity_installed":null,"capacity_announced":null,"capacity_company_reported":null,"verified_throughput":null,"capacity_label":"unknown","evidence_level":"company_reported","last_verified":"2026-09-29","translations":{"summary":{"de":"Realsport betreibt einen vom Unternehmen gemeldeten physischen Aufbereitungs- / Recyclingweg für Kunstrasen in der Schweiz (ab 2025) sowie einen separaten Wiederverwendungsweg für gebrauchte Rollen. Genaue Adresse der Aufbereitung noch nicht nach CTE-Standard verifiziert — keine Kartenmarkierung. Kapazität und Durchsatz UNBEKANNT.","en":"Realsport operates a company-reported physical processing / recycling route for synthetic turf in Switzerland (from 2025) and a separate reuse route for used turf rolls. Exact processing-site address not yet verified to CTE standard — no map pin. Capacity and throughput UNKNOWN.","fr":"Realsport exploite une filière physique de traitement / recyclage du gazon synthétique en Suisse déclarée par l'entreprise (depuis 2025) et une filière distincte de réemploi de rouleaux usagés. Adresse exacte du site de traitement non encore vérifiée selon le standard CTE — pas de repère. Capacité et débit INCONNUS.","nl":"Realsport exploiteert een door het bedrijf gerapporteerde fysieke verwerkings- / recyclingroute voor kunstgras in Zwitserland (vanaf 2025) en een aparte hergebruikroute voor gebruikte rollen. Exact adres van de verwerkingslocatie nog niet geverifieerd volgens CTE-standaard — geen kaartpin. Capaciteit en verwerking ONBEKEND."}},"updated_at":"2026-09-29T12:55:29.501519+00:00","processor_category":"siteUnverified","data_basis":["missing"],"missing_fields":["owner_name","city","address","lat","lng","geocoding_method","capacity_licensed","capacity_installed","capacity_announced","capacity_company_reported","verified_throughput"]},{"slug":"lets-recycle-artificial-grass","name":"Let's Recycle Artificial Grass","operator_name":"Let's Recycle Artificial Grass Ltd","owner_name":null,"country_slug":"united-kingdom","city":"Belvoir, Nottinghamshire","address":"Unit 7, Belvoir Business Park, Woolsthorpe Road, NG13 0GN","lat":52.90575,"lng":-0.79203,"location_status":"official_facility_location_regulatory_address","geocoding_method":"OS National Grid Reference SK 81342 34940 from Environment Agency permit application, converted to WGS84","operational_status":"permit_withdrawn","accepted_streams":[],"accepted_materials":["waste artificial grass (rolls)"],"processes":["washing","separation","shredding","bagging"],"outputs":[{"stream":"Sand and rubber granules","end_market":"washed twice, intended for reuse on new artificial grass","evidence":"permit application (applicant statement)"},{"stream":"Shredded plastic","end_market":"sent to another permitted facility for products such as kickboards and benches","evidence":"permit application (applicant statement)"}],"capacity_licensed":null,"capacity_installed":null,"capacity_announced":null,"capacity_company_reported":null,"verified_throughput":null,"capacity_label":"not counted","evidence_level":"government_source","last_verified":"2026-09-28","translations":{"summary":{"de":"Geplante englische Behandlungsanlage. Ihr Antrag auf eine individuelle Umweltgenehmigung (EPR/VP3926SM/A001) zum Waschen, Trennen, Zerkleinern und Absacken von Kunstrasen in Gummi, Sand und Kunststoff ist als ZURÜCKGEZOGEN gekennzeichnet. GENEHMIGUNGSANTRAG ZURÜCKGEZOGEN — nicht in Betrieb und nicht als britische Recyclingkapazität gezählt.","en":"Proposed English treatment facility. Its bespoke Environmental Permit application (EPR/VP3926SM/A001) for washing, separating, shredding and bagging artificial grass into rubber, sand and plastic is marked WITHDRAWN. PERMIT APPLICATION WITHDRAWN — not operational and not counted as UK recycling capacity.","fr":"Installation de traitement anglaise proposée. Sa demande de permis environnemental spécifique (EPR/VP3926SM/A001) pour laver, séparer, broyer et ensacher le gazon synthétique en caoutchouc, sable et plastique est marquée RETIRÉE. DEMANDE D'AUTORISATION RETIRÉE — pas en activité et non comptée comme capacité de recyclage britannique.","nl":"Voorgestelde Engelse verwerkingsinstallatie. De aanvraag voor een specifieke milieuvergunning (EPR/VP3926SM/A001) voor het wassen, scheiden, versnipperen en verpakken van kunstgras tot rubber, zand en kunststof is gemarkeerd als INGETROKKEN. VERGUNNINGAANVRAAG INGETROKKEN — niet operationeel en niet meegeteld als Britse recyclingcapaciteit."}},"updated_at":"2026-09-28T09:21:17.249654+00:00","processor_category":"project","data_basis":["missing"],"missing_fields":["owner_name","capacity_licensed","capacity_installed","capacity_announced","capacity_company_reported","verified_throughput"]},{"slug":"maxmar-grupa-croatia","name":"MAXMAR GRUPA d.o.o. — mobile pre-processor / on-site material separation (no fixed facility pin)","operator_name":"MAXMAR GRUPA d.o.o.","owner_name":null,"country_slug":"croatia","city":"Jastrebarsko","address":"COMPANY BASE — MOBILE PROCESSING SERVICE (Repulčeva 6, Klinča Sela, 10450 Jastrebarsko; text only, no pin)","lat":null,"lng":null,"location_status":"mobile_processor_no_fixed_facility","geocoding_method":null,"operational_status":"operational","accepted_streams":[],"accepted_materials":["end-of-life synthetic turf at project sites (granulate, sand, turf carpet)"],"processes":["dismantling of old artificial-turf pitches with specialist machine","on-site separation of granulate and sand from turf carpet"],"outputs":[{"stream":"granulate","end_market":"PROJECT-SPECIFIC / UNKNOWN","evidence":"company-reported"},{"stream":"sand","end_market":"PROJECT-SPECIFIC / UNKNOWN","evidence":"company-reported"},{"stream":"turf carpet","end_market":"PROJECT-SPECIFIC / UNKNOWN","evidence":"company-reported"}],"capacity_licensed":null,"capacity_installed":null,"capacity_announced":null,"capacity_company_reported":null,"verified_throughput":null,"capacity_label":"unknown","evidence_level":"company_reported","last_verified":"2026-09-30","translations":{},"updated_at":"2026-09-30T12:11:19.618642+00:00","processor_category":"mobile","data_basis":["missing"],"missing_fields":["owner_name","lat","lng","geocoding_method","capacity_licensed","capacity_installed","capacity_announced","capacity_company_reported","verified_throughput"]},{"slug":"general-sport-field-romania","name":"GENERAL SPORT FIELD (GSF) — mobile pre-processor / on-site material separation (no fixed facility pin)","operator_name":"General Sport Field","owner_name":null,"country_slug":"romania","city":"Bucharest","address":"COMPANY / CONTACT LOCATIONS — MOBILE PROCESSING SERVICE (Strada Levănțica 69, Bucharest; Aprodul Purice 5D, Dorohoi; text only, no pin)","lat":null,"lng":null,"location_status":"mobile_processor_no_fixed_facility","geocoding_method":null,"operational_status":"operational","accepted_streams":[],"accepted_materials":["end-of-life synthetic turf at project sites (sand, rubber granulate, organic infill, turf carpet)"],"processes":["artificial-turf deinstallation with RenoMatic RM1502","infill removal and separation (filters, vibration, blowers)","fibre shredding / cutting (company-reported)","sand / rubber filtering, classifying, sorting (company-reported)"],"outputs":[{"stream":"synthetic fibres","end_market":"PREPARED FOR RECYCLING / REUSE — final destination UNKNOWN","evidence":"company-reported"},{"stream":"sand","end_market":"UNKNOWN","evidence":"company-reported"},{"stream":"rubber granulate / organic infill","end_market":"UNKNOWN","evidence":"company-reported"}],"capacity_licensed":null,"capacity_installed":null,"capacity_announced":null,"capacity_company_reported":null,"verified_throughput":null,"capacity_label":"unknown","evidence_level":"company_reported","last_verified":"2026-09-30","translations":{},"updated_at":"2026-09-30T12:23:57.681951+00:00","processor_category":"mobile","data_basis":["missing"],"missing_fields":["owner_name","lat","lng","geocoding_method","capacity_licensed","capacity_installed","capacity_announced","capacity_company_reported","verified_throughput"]},{"slug":"re-match-tiel","name":"Re-Match Tiel (historical)","operator_name":"Re-Match Netherlands B.V. (bankrupt, February 2025)","owner_name":null,"country_slug":"netherlands","city":"Tiel","address":"Panovenweg 12, 4004 JE Tiel, Netherlands","lat":51.9063872,"lng":5.447929,"location_status":"official_facility_location_public_record_address","geocoding_method":"OpenStreetMap Nominatim, house-number match on published street address","operational_status":"bankrupt","accepted_streams":["sport"],"accepted_materials":["sand","sbr","epdm","tpe","pe","pp","backing"],"processes":["dry mechanical downsizing","drying","separation","air-table separation (historical Re-Match process)"],"outputs":[{"stream":"historic Re-Match outputs","end_market":"sand, rubber, backing, plastic fibre as secondary raw materials","evidence":"historic/company description"}],"capacity_licensed":null,"capacity_installed":"70,000 t/year — LATER COMPANY-REPORTED DESIGN CAPACITY CLAIM. Not actual throughput. Current throughput: not applicable (historical); historical actual throughput: UNKNOWN.","capacity_announced":"55,000 t/year — EARLIER COMPANY-REPORTED DESIGN / PLANNING CLAIM. Not actual throughput.","capacity_company_reported":null,"verified_throughput":null,"capacity_label":"historical design claim","evidence_level":"industry_source","last_verified":"2026-09-28","translations":{"summary":{"de":"Ehemalige Re-Match-Anlage für vollständiges Kunstrasenrecycling am Panovenweg 12 in Tiel, in Betrieb ab Ende 2022 / Hochlauf 2023. Re-Match Netherlands B.V. wurde im Februar 2025 für insolvent erklärt. Auslegungskapazität 70.000 t/Jahr (Unternehmensangabe, historisch); Ziel 2023 ≈55.000 t/Jahr; tatsächlicher Durchsatz unbekannt. Nicht in der aktuellen aktiven Kapazität enthalten.","en":"Former Re-Match full-field recycling facility at Panovenweg 12, Tiel, operational from late 2022 / 2023 ramp-up. Re-Match Netherlands B.V. was declared bankrupt in February 2025. Design capacity 70,000 t/year (company-reported, historical); 2023 target ≈55,000 t/year; actual throughput unknown. Excluded from current active capacity.","fr":"Ancienne installation Re-Match de recyclage de terrain complet au Panovenweg 12 à Tiel, en activité depuis fin 2022 / montée en charge 2023. Re-Match Netherlands B.V. a été déclarée en faillite en février 2025. Capacité de conception 70 000 t/an (déclarée, historique) ; objectif 2023 ≈55 000 t/an ; débit réel inconnu. Exclue de la capacité active actuelle.","nl":"Voormalige Re-Match-installatie voor volledige veldrecycling aan de Panovenweg 12 in Tiel, operationeel vanaf eind 2022 / de opstartperiode in 2023. Re-Match Netherlands B.V. is in februari 2025 failliet verklaard. Ontwerpcapaciteit 70.000 t/jaar (door bedrijf gerapporteerd, historisch); doelstelling 2023 ≈55.000 t/jaar; werkelijke verwerking onbekend. Niet meegeteld in de huidige actieve capaciteit."}},"updated_at":"2026-09-29T07:51:57.194079+00:00","processor_category":"historical","data_basis":["company_reported"],"missing_fields":["owner_name","capacity_licensed","capacity_company_reported","verified_throughput"]},{"slug":"enerius-poland","name":"Enerius Sp. z o.o. — mobile pre-processor / on-site material separation (no fixed facility pin)","operator_name":"Enerius Sp. z o.o.","owner_name":null,"country_slug":"poland","city":"Łódź","address":"COMPANY BASE — MOBILE PROCESSING SERVICE (Łódź; text only, no pin)","lat":null,"lng":null,"location_status":"mobile_processor_no_fixed_facility","geocoding_method":null,"operational_status":"operational","accepted_streams":[],"accepted_materials":["end-of-life synthetic turf at project sites (SBR / EPDM infill, sand, turf carpet)"],"processes":["mechanical brushing / extraction of SBR or EPDM granulate into Big Bags","mechanical sand extraction into Big Bags","carpet cutting and rolling","loading and transport to recycling or disposal destination (project-specific)"],"outputs":[{"stream":"SBR / EPDM granulate","end_market":"PROJECT-SPECIFIC / UNKNOWN (recycling or disposal)","evidence":"company-reported"},{"stream":"sand","end_market":"PROJECT-SPECIFIC / UNKNOWN (recycling or disposal)","evidence":"company-reported"},{"stream":"rolled turf carpet","end_market":"PROJECT-SPECIFIC / UNKNOWN (recycling or disposal)","evidence":"company-reported"}],"capacity_licensed":null,"capacity_installed":null,"capacity_announced":null,"capacity_company_reported":null,"verified_throughput":null,"capacity_label":"unknown","evidence_level":"company_reported","last_verified":"2026-09-30","translations":{},"updated_at":"2026-09-30T05:45:16.872153+00:00","processor_category":"mobile","data_basis":["missing"],"missing_fields":["owner_name","lat","lng","geocoding_method","capacity_licensed","capacity_installed","capacity_announced","capacity_company_reported","verified_throughput"]},{"slug":"gt-sport-hasznalt-mufu","name":"GT SPORT Kft. / Használt Műfű — used-turf removal, cleaning and reuse pre-processor (no fixed facility pin)","operator_name":"GT SPORT Kft.","owner_name":null,"country_slug":"hungary","city":"Budapest","address":"COMPANY OFFICE (1224 Budapest, Barackos út 113; text only, not a verified processing plant, no pin)","lat":null,"lng":null,"location_status":"mobile_processor_no_fixed_facility","geocoding_method":null,"operational_status":"operational","accepted_streams":[],"accepted_materials":["used sports artificial turf (carpet with infill)"],"processes":["professional lifting / removal","mechanical infill removal (company claim: 99%)","cleaning","quality control","selection","resale for second-life reuse"],"outputs":[{"stream":"cleaned turf carpet","end_market":"REUSE (terraces, walls, kennels, gardens, playgrounds, hobby sport)","evidence":"company-reported"},{"stream":"removed infill","end_market":"UNKNOWN / COMPANY CLAIM ONLY","evidence":"company-reported"}],"capacity_licensed":null,"capacity_installed":null,"capacity_announced":null,"capacity_company_reported":null,"verified_throughput":null,"capacity_label":"unknown","evidence_level":"company_reported","last_verified":"2026-09-30","translations":{},"updated_at":"2026-09-30T12:17:42.203572+00:00","processor_category":"mobile","data_basis":["missing"],"missing_fields":["owner_name","lat","lng","geocoding_method","capacity_licensed","capacity_installed","capacity_announced","capacity_company_reported","verified_throughput"]},{"slug":"formaturf-essen","name":"FormaTurf Essen","operator_name":"FormaTurf GmbH","owner_name":null,"country_slug":"germany","city":"Essen","address":"Am Stadthafen 9, 45356 Essen, Germany","lat":51.4992702,"lng":6.9759986,"location_status":"company_confirmed_facility_location","geocoding_method":"company and municipal address","operational_status":"operational","accepted_streams":[],"accepted_materials":[],"processes":["removal / transport to Essen","separation","wet separation / mechanical processing","sand cleaning / recovery","recovery of plastics","processing of recovered plastics into new products"],"outputs":[{"stream":"sand","end_market":"sports-field construction or other construction applications","evidence":"company-reported"},{"stream":"plastic fractions","end_market":"new durable products (e.g. TrionStein edging/building elements, FlexBlock modular elements)","evidence":"company-reported"},{"stream":"functional infill","end_market":null,"evidence":"company-reported"}],"capacity_licensed":null,"capacity_installed":null,"capacity_announced":null,"capacity_company_reported":"Up to 200 pitches/year — company/industry-reported processing capacity. Storage: up to 100 full-size pitches (storage, not annual throughput). Site area 20,000 m² (not capacity). Not verified throughput.","verified_throughput":null,"capacity_label":"company reported","evidence_level":"company_reported","last_verified":"2026-09-28","translations":{"summary":{"de":"Vollständiger Kunstrasen- / Mehrfraktionsrecycler (Sport Group). Anlage in Betrieb seit 2022; die Stadt Essen meldete die Eröffnung am 16. Juni 2023. Mechanisches Recycling. Angegebene Verarbeitungskapazität bis zu 200 Plätze/Jahr (Unternehmens-/Branchenangabe); tatsächlicher Durchsatz unbekannt.","en":"Full-field / multi-fraction synthetic turf recycler (Sport Group). Plant operating since 2022; City of Essen reported the opening on 16 June 2023. Mechanical recycling. Reported processing capacity up to 200 pitches/year (company/industry-reported); actual throughput unknown.","fr":"Recycleur de terrains complets / multifractions de gazon synthétique (Sport Group). Usine en service depuis 2022 ; la ville d'Essen a annoncé l'inauguration le 16 juin 2023. Recyclage mécanique. Capacité de traitement déclarée jusqu'à 200 terrains/an (déclarée par l'entreprise / le secteur) ; débit réel inconnu.","nl":"Volledige veld- / multifractie-kunstgrasrecycler (Sport Group). Installatie in bedrijf sinds 2022; de gemeente Essen meldde de opening op 16 juni 2023. Mechanische recycling. Gerapporteerde verwerkingscapaciteit tot 200 velden/jaar (door bedrijf/sector gerapporteerd); werkelijke verwerking onbekend."}},"updated_at":"2026-09-29T07:49:42.079774+00:00","processor_category":"fixed","data_basis":["company_reported"],"missing_fields":["owner_name","capacity_licensed","capacity_installed","capacity_announced","verified_throughput"]},{"slug":"refield-piobbico","name":"Refield S.r.l. — Piobbico (fixed full-field / multi-fraction processor)","operator_name":"Refield S.r.l.","owner_name":null,"country_slug":"italy","city":"Piobbico","address":"Via Urbania 69, 61046 Piobbico (PU), Marche, Italy","lat":43.592308,"lng":12.505105,"location_status":"company_confirmed_facility_location","geocoding_method":"OpenStreetMap Nominatim — street-level match on company-published operational address (Via Urbania / Via d'Urbania, Piobbico); house number 69 not mapped in OSM","operational_status":"operational","accepted_streams":[],"accepted_materials":["end-of-life synthetic-turf fields (turf rolls incl. infill)"],"processes":["field cutting / removal","authorised transport","shredding of turf rolls","3D centrifugal screening (infill extraction)","aerodynamic granulometric separation of sand and performance infill","carpet size reduction and aerodynamic separation","batch traceability (company-reported)"],"outputs":[{"stream":"silica sand","end_market":"materia prima seconda (company-reported status; End-of-Waste not independently verified)","evidence":"company-reported"},{"stream":"performance infill","end_market":"materia prima seconda (company-reported status; End-of-Waste not independently verified)","evidence":"company-reported"},{"stream":"polymeric turf filaments","end_market":"materia prima seconda (company-reported status; End-of-Waste not independently verified)","evidence":"company-reported"},{"stream":"backing","end_market":"materia prima seconda (company-reported status; End-of-Waste not independently verified)","evidence":"company-reported"}],"capacity_licensed":null,"capacity_installed":null,"capacity_announced":null,"capacity_company_reported":null,"verified_throughput":null,"capacity_label":"unknown","evidence_level":"company_reported","last_verified":"2026-09-30","translations":{},"updated_at":"2026-09-30T05:21:04.887807+00:00","processor_category":"fixed","data_basis":["missing"],"missing_fields":["owner_name","capacity_licensed","capacity_installed","capacity_announced","capacity_company_reported","verified_throughput"]},{"slug":"pr-recycling-filderstadt","name":"PR Recycling GmbH","operator_name":"PR Recycling GmbH","owner_name":null,"country_slug":"germany","city":"Külsheim (registered seat)","address":"REGISTERED COMPANY SEAT: Benzstraße 9–11, 97900 Külsheim, Germany — REGISTERED COMPANY SEAT — NOT VERIFIED AS FIXED SYNTHETIC-TURF PROCESSING FACILITY · Former registered address: Dieselstraße 9, 70794 Filderstadt (historical)","lat":null,"lng":null,"location_status":"no_fixed_processing_location_verified","geocoding_method":null,"operational_status":"operational","accepted_streams":[],"accepted_materials":[],"processes":["removal","transport","separation"],"outputs":[{"stream":"sand/infill/turf fractions","end_market":"reuse/recycling depending on fraction","evidence":"RAL/ESTC profile; final buyer not publicly resolved in current dataset"}],"capacity_licensed":null,"capacity_installed":null,"capacity_announced":null,"capacity_company_reported":null,"verified_throughput":null,"capacity_label":"unknown","evidence_level":"industry_source","last_verified":"2026-09-29","translations":{"summary":{"de":"Aktiver Vorbehandler / Trennbetrieb (mobile / projektbezogene Tätigkeit): Rückbau, Transport und Trennung von Kunstrasensystemen nach RAL-GZ 944/8.1 und 944/8.2. Kein Vollrecycler; keine Zertifizierung 944/8.3 für vollständiges Materialrecycling. Kapazität und Durchsatz UNBEKANNT. Der Standort Filderstadt ist ein Unternehmens- / Registerstandort, kein Nachweis, dass die gesamte Verarbeitung dort stattfindet.","en":"Active pre-processor / separation processor (mobile / project-based activity): removal, transport and separation of artificial-turf systems under RAL-GZ 944/8.1 and 944/8.2. Not a full-field recycler; no 944/8.3 full material recycling certification. Capacity and throughput UNKNOWN. The Filderstadt location is a company / public-record location, not proof that all processing occurs there.","fr":"Prétraiteur / opérateur de séparation actif (activité mobile / par projet) : dépose, transport et séparation de systèmes de gazon synthétique sous RAL-GZ 944/8.1 et 944/8.2. Pas un recycleur complet ; aucune certification 944/8.3 de recyclage complet des matériaux. Capacité et débit INCONNUS. L’emplacement de Filderstadt est une adresse d’entreprise / de registre public, et non la preuve que tout le traitement y a lieu.","nl":"Actieve voorbewerker / scheidingsverwerker (mobiele / projectgebonden activiteit): verwijderen, transporteren en scheiden van kunstgrassystemen onder RAL-GZ 944/8.1 en 944/8.2. Geen volledige recycler; geen certificering 944/8.3 voor volledige materiaalrecycling. Capaciteit en doorzet ONBEKEND. De locatie Filderstadt is een bedrijfs- / openbare-registerlocatie, geen bewijs dat alle verwerking daar plaatsvindt."}},"updated_at":"2026-09-29T09:32:19.766883+00:00","processor_category":"siteUnverified","data_basis":["missing"],"missing_fields":["owner_name","lat","lng","geocoding_method","capacity_licensed","capacity_installed","capacity_announced","capacity_company_reported","verified_throughput"]},{"slug":"sydvac-sweden","name":"Sydvac AB — mobile on-site pre-processor","operator_name":"Sydvac AB","owner_name":null,"country_slug":"sweden","city":null,"address":"Company base: Räften 232, 247 91 Södra Sandby, Sweden — mobile processing on-site at customer fields; no fixed processing facility","lat":null,"lng":null,"location_status":"mobile_processor_no_fixed_facility","geocoding_method":null,"operational_status":"operational","accepted_streams":["sport"],"accepted_materials":[],"processes":["physical removal of artificial turf","vacuum extraction of sand and infill","physical emptying of the turf carpet","separation of filling material","sorting of filling fractions (some projects)","collection of sand and rubber/infill in Big Bags","preparation of carpet rolls for reuse or downstream recycling"],"outputs":[{"stream":"note","end_market":"COMPANY BASE — MOBILE PROCESSING SERVICE","evidence":null},{"stream":"facility_type","end_market":"MOBILE PRE-PROCESSOR / ON-SITE INFILL EXTRACTION AND MATERIAL-SEPARATION PROCESSOR — NOT A FULL-FIELD MATERIAL RECYCLER — NO FIXED FACILITY PIN","evidence":null}],"capacity_licensed":null,"capacity_installed":null,"capacity_announced":null,"capacity_company_reported":null,"verified_throughput":null,"capacity_label":"Capacity: UNKNOWN. Current annual throughput: UNKNOWN. Cumulative company activity (>400,000 m², 12,000 t filling material, Sweden + Denmark) is not capacity or throughput.","evidence_level":"company_reported","last_verified":"2026-09-29","translations":{"summary":{"de":"Mobiler Vorbehandler / Füllmaterialabsaugung und Materialtrennung vor Ort: Rückbau des Kunstrasens, Vakuumabsaugung von Sand und Füllmaterial, Entleeren des Belags, Trennung des Füllmaterials und Vorbereitung von Belagsrollen zur Wiederverwendung oder zum nachgelagerten Recycling. Kein Komplettplatz-Materialrecycler; keine feste Verarbeitungsanlage.","en":"Mobile pre-processor / on-site infill extraction and material separation: turf removal, vacuum extraction of sand and infill, carpet emptying, separation of filling material and preparation of carpet rolls for reuse or downstream recycling. Not a full-field material recycler; no fixed processing facility.","fr":"Prétraiteur mobile / extraction du remplissage et séparation sur site : dépose du gazon, aspiration du sable et du remplissage, vidage du tapis, séparation du remplissage et préparation des rouleaux pour réemploi ou recyclage en aval. Pas un recycleur matière de terrains complets ; aucune installation fixe.","nl":"Mobiele voorbewerker / infillextractie en materiaalscheiding op locatie: verwijderen van kunstgras, vacuümextractie van zand en infill, legen van de mat, scheiding van vulmateriaal en voorbereiding van matrollen voor hergebruik of verdere recycling. Geen volledige-veld-materiaalrecycler; geen vaste verwerkingsinstallatie."}},"updated_at":"2026-09-29T10:29:21.640197+00:00","processor_category":"mobile","data_basis":["missing"],"missing_fields":["owner_name","city","lat","lng","geocoding_method","capacity_licensed","capacity_installed","capacity_announced","capacity_company_reported","verified_throughput"]},{"slug":"vink-barneveld","name":"Vink (Barneveld) — historical recycler","operator_name":"Vink Holding B.V.","owner_name":null,"country_slug":"netherlands","city":"Barneveld","address":"Valkseweg 62, 3771 RG Barneveld (company address); waste site Wencopperweg, Barneveld","lat":null,"lng":null,"location_status":"address_not_precise_enough","geocoding_method":null,"operational_status":"historical","accepted_streams":["sport"],"accepted_materials":["turf carpet"],"processes":["infill removal","size reduction","separation"],"outputs":[{"stream":"Sand","end_market":"mainly drainage applications","evidence":"historical public evidence"},{"stream":"PE/PP plastic fraction","end_market":"drainage-pipe wrapping / plastic applications","evidence":"historical public evidence"},{"stream":"Latex backing","end_market":"not fully recycled; remained in residue","evidence":"historical public evidence"}],"capacity_licensed":null,"capacity_installed":"≈35 kt/year — HISTORICAL REPORTED PROCESSING CAPACITY (government-linked publication). Not current; excluded from active capacity.","capacity_announced":null,"capacity_company_reported":null,"verified_throughput":null,"capacity_label":"historical","evidence_level":"government_source","last_verified":"2026-09-28","translations":{"summary":{"de":"Abfallunternehmen, das bis November 2018 Kunstrasenmatten annahm und verarbeitete und dann die Annahme neuen Kunstrasens mit sofortiger Wirkung einstellte. Die 2019 im Auftrag des niederländischen Ministeriums für Infrastruktur und Wasserwirtschaft erstellte Studie nennt Vink als eines von zwei niederländischen Unternehmen, die kurz zuvor aufgehört hatten. Kapazität, Durchsatz oder aktuelle Kunstrasenaktivität sind nicht öffentlich dokumentiert.","en":"Waste company that took in and processed artificial-turf mats until November 2018, when it stopped accepting new turf with immediate effect. The 2019 study commissioned by the Dutch Ministry of Infrastructure and Water Management describes Vink as one of two Dutch companies that had recently stopped. No capacity, throughput or current turf activity is publicly documented.","fr":"Entreprise de déchets qui a réceptionné et traité des tapis de gazon synthétique jusqu'en novembre 2018, date à laquelle elle a cessé avec effet immédiat d'accepter du nouveau gazon. L'étude de 2019 commandée par le ministère néerlandais des Infrastructures et de la Gestion de l'eau cite Vink comme l'une des deux entreprises néerlandaises ayant récemment cessé. Aucune capacité, aucun débit ni aucune activité actuelle liée au gazon n'est documenté publiquement.","nl":"Afvalbedrijf dat tot november 2018 kunstgrasmatten innam en verwerkte en toen per direct stopte met de inname van nieuw kunstgras. De studie uit 2019 in opdracht van het ministerie van Infrastructuur en Waterstaat noemt Vink als een van twee Nederlandse bedrijven die recent waren gestopt. Er is geen capaciteit, verwerkte hoeveelheid of huidige kunstgrasactiviteit publiek gedocumenteerd."}},"updated_at":"2026-09-29T07:49:42.079774+00:00","processor_category":"historical","data_basis":["company_reported"],"missing_fields":["owner_name","lat","lng","geocoding_method","capacity_licensed","capacity_announced","capacity_company_reported","verified_throughput"]},{"slug":"ife-waidhofen","name":"IFE Aufbereitungstechnik — Waidhofen an der Ybbs (March 2026 infill project)","operator_name":"IFE Aufbereitungstechnik GmbH","owner_name":null,"country_slug":"austria","city":"Waidhofen an der Ybbs","address":"Waidhofen an der Ybbs, Austria (technical centre / Technikum; no pin — project-specific)","lat":null,"lng":null,"location_status":"project_specific_no_pin","geocoding_method":null,"operational_status":"project_specific","accepted_streams":[],"accepted_materials":["used artificial-turf infill (rubber granulate + sand, with fibres and contaminants), several Big Bags"],"processes":["linear vibrating screen (removal of fibres, leaves, branches, contaminants)","IFE SORT density separation (vibration + air flow): rubber granulate / sand"],"outputs":[{"stream":"cleaned rubber granulate","end_market":"suitable for direct reuse as artificial-turf infill (REUSE — not material recycling)","evidence":"municipal source"},{"stream":"separated sand","end_market":null,"evidence":"municipal source"}],"capacity_licensed":null,"capacity_installed":null,"capacity_announced":null,"capacity_company_reported":null,"verified_throughput":null,"capacity_label":"unknown","evidence_level":"official_source_verified","last_verified":"2026-09-29","translations":{"summary":{"de":"Im März 2026 bereitete IFE (Maschinenbau / Trenntechnik) in seinem Technikum gebrauchtes Kunstrasen-Füllmaterial aus mehreren Big Bags physisch auf: Siebung, dann Dichtetrennung von Gummigranulat und Sand. Das gereinigte Granulat konnte als Füllmaterial wiederverwendet werden (Wiederverwendung, kein stoffliches Recycling). Projektbezogen / Demonstration — Jahreskapazität und Durchsatz UNBEKANNT; nicht als kommerzieller Recycler gezählt.","en":"In March 2026 IFE (machinery / separation-technology company) physically processed used artificial-turf infill from several Big Bags in its technical centre: screening, then density separation of rubber granulate from sand. The cleaned granulate could be reused as infill (reuse, not material recycling). Project-specific / demonstration case — annual capacity and throughput UNKNOWN; not counted as a commercial recycler.","fr":"En mars 2026, IFE (fabricant de machines / technologies de séparation) a traité physiquement dans son centre technique du remplissage usagé issu de plusieurs big bags : criblage, puis séparation densimétrique des granulats de caoutchouc et du sable. Les granulats nettoyés pouvaient être réemployés comme remplissage (réemploi, pas recyclage matière). Cas spécifique à un projet / démonstration — capacité et débit annuels INCONNUS ; non compté comme recycleur commercial.","nl":"In maart 2026 verwerkte IFE (machine- / scheidingstechniekbedrijf) in zijn technisch centrum gebruikte kunstgrasinfill uit meerdere bigbags: zeven, daarna dichtheidsscheiding van rubbergranulaat en zand. Het gereinigde granulaat kon als infill worden hergebruikt (hergebruik, geen materiaalrecycling). Projectspecifiek / demonstratie — jaarcapaciteit en verwerking ONBEKEND; niet meegeteld als commerciële recycler."}},"updated_at":"2026-09-29T12:16:38.273975+00:00","processor_category":"project","data_basis":["missing"],"missing_fields":["owner_name","lat","lng","geocoding_method","capacity_licensed","capacity_installed","capacity_announced","capacity_company_reported","verified_throughput"]},{"slug":"infrasports-creutzwald","name":"Infrasports processing unit","operator_name":"Infrasports","owner_name":null,"country_slug":"france","city":"Creutzwald","address":"Processing facility: Siège 2 La Houve, Route Forestière de Ham, 57150 Creutzwald, France · Company/contact address: 1 rue des Alouettes, 57660 Leyviller, France","lat":49.2004403,"lng":6.6517453,"location_status":"official_facility_location_regulatory_address","geocoding_method":"OpenStreetMap Nominatim — \"Ancienne Mine de la Houve Siège 2\", Creutzwald; address from Préfecture de la Moselle 2025 authorisation and DREAL Grand Est inspection (29 Jan 2026)","operational_status":"operational","accepted_streams":[],"accepted_materials":[],"processes":["reuse screening","separation of constituents","material recovery","storage","external treatment / energy recovery for non-recoverable fractions"],"outputs":[{"stream":"reusable turf","end_market":"resold / reused (REUSE, not recycling)","evidence":"public authority document"},{"stream":"sand","end_market":null,"evidence":"public authority document"},{"stream":"polyethylene","end_market":null,"evidence":"public authority document"},{"stream":"polypropylene","end_market":null,"evidence":"public authority document"},{"stream":"non-recoverable waste","end_market":"external treatment or energy recovery","evidence":"public authority document"}],"capacity_licensed":null,"capacity_installed":null,"capacity_announced":null,"capacity_company_reported":null,"verified_throughput":null,"capacity_label":"unknown","evidence_level":"company_reported","last_verified":"2026-09-28","translations":{"summary":{"de":"Aktive Recycling- / Behandlungsplattform für Kunststoffsportbeläge, behördliche Genehmigung bestätigt (arrêté préfectoral n°2025-DCAT/BEPE-85, 28. Februar 2025). Standort seit 2019 betrieben (ca. 2,4 ha). Zuerst Prüfung auf Wiederverwendung; nicht wiederverwendbarer Rasen wird in verwertbare Materialien getrennt (z. B. Sand, PE, PP); nicht verwertbarer Abfall geht in externe Behandlung oder energetische Verwertung. Eine Recyclingquote von 98% ist eine vom Unternehmen/Projekt angegebene Schätzung aus einem kommunalen Dokument von 2024, nicht unabhängig gemessen. Kapazität und Durchsatz unbekannt. Der Firmensitz (Leyviller) ist nicht der Anlagenstandort.","en":"Active synthetic-surface recycling / treatment platform, regulatory authorisation confirmed (arrêté préfectoral n°2025-DCAT/BEPE-85, 28 February 2025). Site operated since 2019 (approx. 2.4 ha). Reuse screening first; non-reusable turf is separated into recoverable materials (e.g. sand, PE, PP); non-recoverable waste goes to external treatment or energy recovery. A 98% recycling rate is a company/project-reported estimate reproduced in a 2024 local-authority document, not independently measured. Capacity and throughput unknown. Company headquarters (Leyviller) is not the facility location.","fr":"Plateforme active de recyclage / traitement de sols sportifs synthétiques, autorisation réglementaire confirmée (arrêté préfectoral n°2025-DCAT/BEPE-85, 28 février 2025). Site exploité depuis 2019 (env. 2,4 ha). Tri préalable pour réemploi ; le gazon non réutilisable est séparé en matériaux valorisables (p. ex. sable, PE, PP) ; les déchets non valorisables vont vers un traitement externe ou une valorisation énergétique. Un taux de recyclage de 98% est une estimation déclarée par l'entreprise/le projet, reprise dans un document de collectivité de 2024, non mesurée de manière indépendante. Capacité et débit inconnus. Le siège (Leyviller) n'est pas le site de l'installation.","nl":"Actief recyclingplatform voor kunststofsportvloeren, vergunning bevestigd (arrêté préfectoral n°2025-DCAT/BEPE-85, 28 februari 2025). Terrein in gebruik sinds 2019 (ca. 2,4 ha). Eerst beoordeling op hergebruik; niet-herbruikbaar kunstgras wordt gescheiden in terugwinbare materialen (bijv. zand, PE, PP); niet-terugwinbaar afval gaat naar externe verwerking of energieterugwinning. Een recyclingpercentage van 98% is een door bedrijf/project gerapporteerde schatting, overgenomen in een lokaal overheidsdocument uit 2024, niet onafhankelijk gemeten. Capaciteit en verwerking onbekend. Het hoofdkantoor (Leyviller) is niet de locatie van de installatie."}},"updated_at":"2026-09-29T07:49:42.079774+00:00","processor_category":"fixed","data_basis":["missing"],"missing_fields":["owner_name","capacity_licensed","capacity_installed","capacity_announced","capacity_company_reported","verified_throughput"]},{"slug":"re-match-erstein","name":"Erstein recycling site (former Re-Match France)","operator_name":"Former Re-Match France","owner_name":null,"country_slug":"france","city":"Erstein","address":"15 rue de Johannesburg, 67150 Erstein, France","lat":null,"lng":null,"location_status":"address_not_matched_to_building","geocoding_method":null,"operational_status":"closed","accepted_streams":[],"accepted_materials":[],"processes":["historic Re-Match dry mechanical downsizing/cleaning/separation"],"outputs":[{"stream":"historic Re-Match outputs","end_market":"sand, rubber, backing, fibre","evidence":"historic design claims"}],"capacity_licensed":null,"capacity_installed":null,"capacity_announced":"55,000 t/year — HISTORICAL COMPANY-REPORTED DESIGN CAPACITY (production started 2024). Not throughput; not current capacity. Closed / liquidation / asset-sale context.","capacity_company_reported":null,"verified_throughput":null,"capacity_label":"historical design claim","evidence_level":"industry_source","last_verified":"2026-09-28","translations":{"summary":{"de":"Die Anlage nahm im März 2024 die Produktion auf und wurde im April 2025 gerichtlich liquidiert. Ein Jahr später wurde berichtet, dass Kunstrasenrollen weiterhin auf dem Gelände lagern. Eine geprüfte Verarbeitungsmenge wurde nie veröffentlicht.","en":"Plant began production in March 2024 and was placed in judicial liquidation in April 2025. Reporting a year later described turf rolls still stored on the site awaiting clean-up. No verified processed tonnage was ever published.","fr":"L'usine a démarré sa production en mars 2024 et a été placée en liquidation judiciaire en avril 2025. Un an plus tard, des rouleaux de gazon étaient toujours signalés sur le site en attente de dépollution. Aucun tonnage traité vérifié n'a été publié.","nl":"De fabriek startte de productie in maart 2024 en werd in april 2025 gerechtelijk geliquideerd. Een jaar later werd gemeld dat kunstgrasrollen nog op het terrein lagen in afwachting van opruiming. Een geverifieerde verwerkte tonnage is nooit gepubliceerd."}},"updated_at":"2026-09-29T07:49:42.079774+00:00","processor_category":"historical","data_basis":["company_reported"],"missing_fields":["owner_name","lat","lng","geocoding_method","capacity_licensed","capacity_installed","capacity_company_reported","verified_throughput"]},{"slug":"sportex-grangemouth","name":"Sportex Grangemouth","operator_name":"Sportex Group Limited","owner_name":null,"country_slug":"united-kingdom","city":"Grangemouth, Scotland","address":"13–17 Abbotsinch Road, Grangemouth, FK3 9UX, Scotland, United Kingdom","lat":56.0136414,"lng":-3.7069824,"location_status":"official_facility_location_public_record_address","geocoding_method":"Companies House registered office (SPORTEX GROUP LIMITED, SC266140, active), geocoded to Abbotsinch Industrial Estate","operational_status":"operational","accepted_streams":[],"accepted_materials":[],"processes":["pitch removal/transport","rubber separation","sand cleaning/drying/grading","turf shredding/cleaning","plastic agglomeration"],"outputs":[{"stream":"rubber granulate","end_market":"cleaned/graded for reuse subject to standards","evidence":"company-reported"},{"stream":"sand","end_market":"reuse in new synthetic-turf installations","evidence":"company-reported"},{"stream":"plastic agglomerate","end_market":"recycled plastic kickboards sold back into sports industry","evidence":"company-reported"}],"capacity_licensed":null,"capacity_installed":null,"capacity_announced":null,"capacity_company_reported":"500,000 m²/year — COMPANY-REPORTED CAPACITY (not converted to tonnes). Mass-equivalent claims: 12,500 t/year (Sportex estimate) and 17,500 t/year (SAPCA published claim) — CONFLICTING PUBLIC MASS-EQUIVALENT CLAIMS — NO VERIFIED TONNAGE THROUGHPUT AVAILABLE.","verified_throughput":null,"capacity_label":"company reported","evidence_level":"company_reported","last_verified":"2026-09-28","translations":{"summary":{"de":"Sportex nennt eine installierte Kapazität von bis zu 500.000 m² pro Jahr (Unternehmensangabe). Öffentliche Massenäquivalente widersprechen sich: etwa 12.500 t/Jahr auf der Unternehmenswebsite und etwa 17.500 t/Jahr im SAPCA-Mitgliedsprofil. Keines davon ist ein verifizierter tatsächlicher Durchsatz.","en":"Sportex states an installed capacity of up to 500,000 m² a year (company reported). Public mass-equivalent claims conflict: about 12,500 t/year on the company website and about 17,500 t/year in the SAPCA member profile. Neither is verified throughput.","fr":"Sportex annonce une capacité installée pouvant atteindre 500 000 m² par an (déclaration de l’entreprise). Les équivalents massiques publics divergent : environ 12 500 t/an sur le site de l’entreprise et environ 17 500 t/an dans le profil de membre SAPCA. Aucun des deux n’est un débit réel vérifié.","nl":"Sportex noemt een geïnstalleerde capaciteit tot 500.000 m² per jaar (bedrijfsopgave). Openbare massa-equivalenten spreken elkaar tegen: ongeveer 12.500 t/jaar op de bedrijfswebsite en ongeveer 17.500 t/jaar in het SAPCA-ledenprofiel. Geen van beide is geverifieerde werkelijke verwerking."}},"updated_at":"2026-09-29T07:49:42.079774+00:00","processor_category":"fixed","data_basis":["company_reported"],"missing_fields":["owner_name","capacity_licensed","capacity_installed","capacity_announced","verified_throughput"]},{"slug":"jnc-premier-pitches","name":"JNC Premier Pitches (J.N. Cummins & Co. Ltd.) — mobile / project-based pre-processor","operator_name":"J.N. Cummins & Co. Ltd. t/a JNC Premier Pitches","owner_name":null,"country_slug":"ireland","city":"Cashel","address":"Mayfield, Cashel, Co. Tipperary, E25 TD32 (company base — mobile / project-based processing)","lat":null,"lng":null,"location_status":"mobile_processor_no_fixed_facility","geocoding_method":null,"operational_status":"operational","accepted_streams":[],"accepted_materials":["end-of-life synthetic turf (mat + infill) removed during resurfacing"],"processes":["removal of old turf and infill (SMG Turf Muncher)","separation of old materials"],"outputs":[{"stream":"facility_type","end_market":"MOBILE PRE-PROCESSOR / PITCH-RESURFACING MATERIAL-SEPARATION ACTOR — NOT A FULL-FIELD MATERIAL RECYCLER — NO FIXED FACILITY PIN","evidence":null}],"capacity_licensed":null,"capacity_installed":null,"capacity_announced":null,"capacity_company_reported":null,"verified_throughput":null,"capacity_label":"unknown","evidence_level":"company_reported","last_verified":"2026-09-29","translations":{"summary":{"de":"Mobiler / projektbezogener Vorbehandler: entfernt und trennt alten Kunstrasen und Füllmaterial bei Sanierungen; Firmensitz Cashel (nur Text, keine Markierung). Kapazität und Durchsatz UNBEKANNT; Endverarbeiter UNBEKANNT / projektbezogen.","en":"Mobile / project-based pre-processor: removes and separates old turf and infill during resurfacing; company base Cashel (text only, no pin). Capacity and throughput UNKNOWN; downstream final processor UNKNOWN / project-specific.","fr":"Prétraiteur mobile / par projet : enlève et sépare l'ancien gazon et le remplissage lors des rénovations ; siège Cashel (texte uniquement, sans repère). Capacité et débit INCONNUS ; transformateur final INCONNU / par projet.","nl":"Mobiele / projectgebonden voorbewerker: verwijdert en scheidt oud kunstgras en infill bij renovaties; bedrijfsbasis Cashel (alleen tekst, geen pin). Capaciteit en verwerking ONBEKEND; eindverwerker ONBEKEND / projectspecifiek."}},"updated_at":"2026-09-29T14:18:18.764919+00:00","processor_category":"mobile","data_basis":["missing"],"missing_fields":["owner_name","lat","lng","geocoding_method","capacity_licensed","capacity_installed","capacity_announced","capacity_company_reported","verified_throughput"]},{"slug":"eurofield-isbergues","name":"Fieldservices / Eurofield — Isbergues","operator_name":"Fieldservices","owner_name":null,"country_slug":"france","city":"Isbergues (62)","address":"Isbergues, Pas-de-Calais (62), France — no approved street address","lat":50.6245173,"lng":2.4516565,"location_status":"industrial_processing_location_city_level","geocoding_method":"city-level (Nominatim)","operational_status":"operational","accepted_streams":["sport"],"accepted_materials":["de-infilled turf carpet"],"processes":["on-site automated cutting (Fieldservices)","on-site infill extraction by mechanical beating","transport of rolled de-infilled carpet","mechanical processing","fibre / backing separation","backing shredded to chips"],"outputs":[{"stream":"fibre","end_market":"PE extrusion industry — MATERIAL RECYCLING ROUTE (company-described closed-loop PE route)","evidence":"company-reported"},{"stream":"backing","end_market":"shredded to chips → ENERGY RECOVERY / combustion in nearby industry — NOT material recycling","evidence":"company-reported"}],"capacity_licensed":null,"capacity_installed":null,"capacity_announced":null,"capacity_company_reported":null,"verified_throughput":null,"capacity_label":"unknown","evidence_level":"company_reported","last_verified":"2026-09-28","translations":{"summary":{"de":"Aktiver Verarbeiter von Kunstrasenbelägen / Teilströmen. Fieldservices entfernt den Füllstoff vor Ort, bevor der gerollte, entfüllte Belag nach Isbergues transportiert wird; dieser Standort verarbeitet daher vor allem entfüllte Beläge, nicht das vollständige Platzsystem. Die Belagbestandteile werden getrennt; Fasern gehen ins Kunststoffrecycling (PE-Extrusion), während der Träger nach Unternehmensangaben energetisch verwertet wird. Kapazität und Durchsatz unbekannt.","en":"Active turf-carpet / part-stream processor. Fieldservices removes the infill on site before the rolled, de-infilled carpet is transported to Isbergues, so this site processes mainly de-infilled carpet, not the complete field system. The carpet components are separated; fibres are routed to plastics recycling (PE extrusion), while the backing is reportedly used for energy recovery. Capacity and throughput unknown.","fr":"Transformateur actif de tapis de gazon / de flux partiels. Fieldservices retire le remplissage sur site avant le transport du tapis roulé sans remplissage vers Isbergues ; ce site traite donc principalement des tapis sans remplissage, pas le système complet. Les composants du tapis sont séparés ; les fibres sont orientées vers le recyclage des plastiques (extrusion PE), tandis que le dossier serait utilisé en valorisation énergétique. Capacité et débit inconnus.","nl":"Actieve verwerker van kunstgrasmatten / deelstromen. Fieldservices verwijdert de infill op locatie voordat de opgerolde, ontdane mat naar Isbergues wordt vervoerd; deze locatie verwerkt dus vooral ontdane matten, niet het volledige veldsysteem. De matonderdelen worden gescheiden; vezels gaan naar kunststofrecycling (PE-extrusie), terwijl de backing volgens het bedrijf wordt gebruikt voor energieterugwinning. Capaciteit en verwerking onbekend."}},"updated_at":"2026-09-28T09:47:55.998691+00:00","processor_category":"fixed","data_basis":["missing"],"missing_fields":["owner_name","capacity_licensed","capacity_installed","capacity_announced","capacity_company_reported","verified_throughput"]},{"slug":"bosque-urbano-malpartida","name":"Bosque Urbano, S.L. — Malpartida de Plasencia (fixed part-stream processor, artificial-turf plastic)","operator_name":"Bosque Urbano, S.L.","owner_name":null,"country_slug":"spain","city":"Malpartida de Plasencia","address":"Parcela 5, Polígono Industrial Molino de Viento, Malpartida de Plasencia (Cáceres)","lat":39.97483,"lng":-6.02252,"location_status":"official_facility_location_regulatory_address","geocoding_method":"UTM ETRS89 zone 29 X 754,270 / Y 4,429,210 from Junta de Extremadura permit AAU 23/120, converted to WGS84","operational_status":"operational","accepted_streams":[],"accepted_materials":["artificial turf — LER 17 02 03 plastic (permit-listed)"],"processes":["R1201 classification / sorting","R1203 mechanical treatment (crushing, fragmentation, cutting, compaction)"],"outputs":[{"stream":"facility_type","end_market":"FIXED PART-STREAM PROCESSOR — REGULATOR-AUTHORISED TURF-DERIVED PLASTIC (NOT A FULL-FIELD RECYCLER)","evidence":null}],"capacity_licensed":"10 t/year artificial-turf plastic (LER 17 02 03) — permit-listed quantity, not throughput; total plant ≈4,115 t/year all waste categories is not turf capacity","capacity_installed":null,"capacity_announced":null,"capacity_company_reported":null,"verified_throughput":null,"capacity_label":"permitted","evidence_level":"regulatory","last_verified":"2026-09-29","translations":{},"updated_at":"2026-09-29T14:26:13.085346+00:00","processor_category":"fixed","data_basis":["company_reported"],"missing_fields":["owner_name","capacity_installed","capacity_announced","capacity_company_reported","verified_throughput"]},{"slug":"revalgreen-grenay","name":"RevalGreen Grenay","operator_name":"RevalGreen / SERFIM Recyclage","owner_name":null,"country_slug":"france","city":"Grenay (Isère)","address":"130 impasse de la Gare, 38540 Grenay, Isère, France (not Grenay, Pas-de-Calais)","lat":45.654625,"lng":5.058009,"location_status":"official_facility_location_regulatory_address","geocoding_method":"OpenStreetMap Nominatim, house-number match on published street address","operational_status":"operational","accepted_streams":[],"accepted_materials":[],"processes":["intake","shredding","screening / separation","recovery / reuse routes"],"outputs":[{"stream":"sand","end_market":null,"evidence":"company-reported (approx. 60% typical composition)"},{"stream":"infill granulate","end_market":null,"evidence":"company-reported (approx. 30% typical composition)"},{"stream":"plastic fibres","end_market":null,"evidence":"company-reported (approx. 10% typical composition)"}],"capacity_licensed":null,"capacity_installed":null,"capacity_announced":null,"capacity_company_reported":null,"verified_throughput":null,"capacity_label":"unknown","evidence_level":"company_reported","last_verified":"2026-09-28","translations":{"summary":{"de":"Aktiver vollständiger / Mehrfraktions-Kunstrasenrecycler (SERFIM-Gruppe), genehmigte ICPE-Anlage. Zerkleinerung und Siebung/Trennung in Sand, Füllgranulat und Kunststofffasern. SERFIM meldet 9.000 t behandelt 2022 und 5.500 t recycelt 2023 (Unternehmensangabe, historisch), ein Ziel von 15.000 t/Jahr und eine Flächenangabe von 400.000 m²/Jahr; ~98% Verwertung ist eine Unternehmensangabe. Aktueller verifizierter Durchsatz 2026 unbekannt.","en":"Active full-field / multi-fraction synthetic turf recycler (SERFIM group), authorised ICPE facility. Shredding and screening/separation into sand, infill granulate and plastic fibres. SERFIM reports 9,000 t treated in 2022 and 5,500 t recycled in 2023 (company-reported historical), a 15,000 t/year target and a 400,000 m²/year area claim; ~98% recovery is a company-reported claim. Current 2026 verified throughput unknown.","fr":"Recycleur actif de terrains complets / multifractions de gazon synthétique (groupe SERFIM), installation ICPE autorisée. Broyage et criblage/séparation en sable, granulat de remplissage et fibres plastiques. SERFIM déclare 9 000 t traitées en 2022 et 5 500 t recyclées en 2023 (historique déclaré par l'entreprise), un objectif de 15 000 t/an et une surface déclarée de 400 000 m²/an ; ~98% de valorisation est une déclaration de l'entreprise. Débit vérifié actuel 2026 inconnu.","nl":"Actieve volledige veld- / multifractie-kunstgrasrecycler (SERFIM-groep), vergunde ICPE-installatie. Shredderen en zeven/scheiden in zand, infillgranulaat en kunststofvezels. SERFIM meldt 9.000 t verwerkt in 2022 en 5.500 t gerecycled in 2023 (door bedrijf gerapporteerd, historisch), een doelstelling van 15.000 t/jaar en een oppervlakteclaim van 400.000 m²/jaar; ~98% terugwinning is een claim van het bedrijf. Actuele geverifieerde verwerking 2026 onbekend."}},"updated_at":"2026-09-29T07:51:57.194079+00:00","processor_category":"fixed","data_basis":["missing"],"missing_fields":["owner_name","capacity_licensed","capacity_installed","capacity_announced","capacity_company_reported","verified_throughput"]},{"slug":"pomont-sur","name":"Pomont Sur, S.L. — pre-processing / material separation / reuse (no fixed pin)","operator_name":"Pomont Sur, S.L.","owner_name":null,"country_slug":"spain","city":"La Puebla de Cazalla","address":"Avda. Antonio Fuentes 14, 1B, 41540 La Puebla de Cazalla, Sevilla (company base — processing site not verified)","lat":null,"lng":null,"location_status":"company_base_processing_site_not_verified","geocoding_method":null,"operational_status":"operational","accepted_streams":[],"accepted_materials":["end-of-life artificial turf (carpet + sand/rubber infill) removed from fields"],"processes":["removal","separation of sand and rubber","carpet cleaning / brushing / preparation for non-sport reuse"],"outputs":[{"stream":"facility_type","end_market":"PRE-PROCESSOR / MATERIAL-SEPARATION / REUSE PROCESSOR — NOT A FULL-FIELD FINAL MATERIAL RECYCLER — NO FIXED PIN","evidence":null}],"capacity_licensed":null,"capacity_installed":null,"capacity_announced":null,"capacity_company_reported":null,"verified_throughput":null,"capacity_label":"unknown","evidence_level":"company_reported","last_verified":"2026-09-29","translations":{},"updated_at":"2026-09-29T14:26:13.085346+00:00","processor_category":"siteUnverified","data_basis":["missing"],"missing_fields":["owner_name","lat","lng","geocoding_method","capacity_licensed","capacity_installed","capacity_announced","capacity_company_reported","verified_throughput"]},{"slug":"decamp-acteco","name":"DECAMP (ACTECO-led, 2024–2026) — R&D / pilot turf recycling project (not a commercial facility)","operator_name":"ACTECO Productos y Servicios, S.L. (project lead)","owner_name":null,"country_slug":"spain","city":null,"address":"Valencia-region R&D / pilot project — no standard facility location","lat":null,"lng":null,"location_status":"rd_pilot_project_no_pin","geocoding_method":null,"operational_status":"project_specific","accepted_streams":[],"accepted_materials":["used artificial turf supplied for project tests (PE, PP, latex-containing backing, other fractions)"],"processes":["mechanical / physical separation (pilot / industrial-scale testing)"],"outputs":[{"stream":"facility_type","end_market":"R&D / PILOT PHYSICAL RECYCLING PROJECT — NOT A VERIFIED COMMERCIAL FACILITY — NO STANDARD PIN","evidence":null}],"capacity_licensed":null,"capacity_installed":null,"capacity_announced":null,"capacity_company_reported":null,"verified_throughput":null,"capacity_label":"unknown","evidence_level":"public_authority_reported","last_verified":"2026-09-29","translations":{},"updated_at":"2026-09-29T14:26:13.085346+00:00","processor_category":"project","data_basis":["missing"],"missing_fields":["owner_name","city","lat","lng","geocoding_method","capacity_licensed","capacity_installed","capacity_announced","capacity_company_reported","verified_throughput"]},{"slug":"krb-torgau-zinna","name":"KRB Sportboden-Recycling — Torgau-Zinna","operator_name":"KRB Sportboden-Recycling GmbH","owner_name":null,"country_slug":"germany","city":"Torgau (OT Zinna)","address":"Dorfstraße 51, 04860 Torgau / OT Zinna, Germany (HRB 37836, Registergericht Leipzig)","lat":51.5680784,"lng":12.9490732,"location_status":"official_facility_location_public_record_address","geocoding_method":"Nominatim exact building match","operational_status":"operational","accepted_streams":["sport"],"accepted_materials":["turf carpet","infill"],"processes":["collection","separation","sorting","shredding","cleaning","reuse / material recovery"],"outputs":[{"stream":"granulates","end_market":null,"evidence":"company-reported"},{"stream":"quartz sand","end_market":null,"evidence":"company-reported"},{"stream":"base-layer / filler materials","end_market":null,"evidence":"company-reported"},{"stream":"composite materials","end_market":null,"evidence":"company-reported"}],"capacity_licensed":null,"capacity_installed":null,"capacity_announced":null,"capacity_company_reported":null,"verified_throughput":null,"capacity_label":"unknown","evidence_level":"company_reported","last_verified":"2026-09-28","translations":{"summary":{"de":"Aktive Kunstrasen-Recycling- / Mehrfraktions-Verarbeitungsanlage. Das Unternehmen gibt eine eigene zertifizierte Anlage, eigene Logistik und ein Verfahren aus Sammlung, Trennung, Sortierung, Zerkleinerung, Reinigung und Materialrückgewinnung an. Vom Unternehmen angegebene Materialwege: Rohstoff für neue Kunstrasenprodukte, andere Kunststoffprodukte und Bauanwendungen. RAL-gelistet unter RAL-GZ 944 (944/8, 8.1, 8.2). Kapazität und Durchsatz unbekannt.","en":"Active synthetic-turf recycling / multi-fraction processing facility. The company reports an own certified facility, own logistics and a process of collection, separation, sorting, shredding, cleaning and material recovery. Company-reported material routes: feedstock for new artificial-turf products, other plastic products and construction applications. RAL-listed under RAL-GZ 944 (944/8, 8.1, 8.2). Capacity and throughput unknown.","fr":"Installation active de recyclage de gazon synthétique / de traitement multifractions. L'entreprise déclare une installation certifiée propre, sa propre logistique et un procédé de collecte, séparation, tri, broyage, nettoyage et récupération de matière. Filières déclarées par l'entreprise : matière première pour de nouveaux produits en gazon synthétique, d'autres produits plastiques et des applications de construction. Répertoriée RAL sous RAL-GZ 944 (944/8, 8.1, 8.2). Capacité et débit inconnus.","nl":"Actieve kunstgrasrecycling- / multifractieverwerkingsinstallatie. Het bedrijf meldt een eigen gecertificeerde installatie, eigen logistiek en een proces van inzameling, scheiding, sortering, shredderen, reiniging en materiaalterugwinning. Door het bedrijf gerapporteerde materiaalroutes: grondstof voor nieuwe kunstgrasproducten, andere kunststofproducten en bouwtoepassingen. RAL-vermeld onder RAL-GZ 944 (944/8, 8.1, 8.2). Capaciteit en werkelijke verwerking onbekend."}},"updated_at":"2026-09-29T07:49:42.079774+00:00","processor_category":"fixed","data_basis":["missing"],"missing_fields":["owner_name","capacity_licensed","capacity_installed","capacity_announced","capacity_company_reported","verified_throughput"]},{"slug":"despriet-gebroeders","name":"Plastic Recycling Despriet — Harelbeke","operator_name":"Plastic Recycling Despriet (legal/historical name: Despriet Gebroeders NV)","owner_name":null,"country_slug":"belgium","city":"Harelbeke","address":"Processing site: Keizersstraat 48A, 8530 Harelbeke, Belgium","lat":50.8256802,"lng":3.3118374,"location_status":"company_confirmed_facility_location","geocoding_method":"OpenStreetMap Nominatim — exact house-number match on verified public address","operational_status":"operational","accepted_streams":[],"accepted_materials":["plastic waste","artificial-turf fractions","artificial-turf carpets"],"processes":["washing","densification","grinding / size reduction"],"outputs":[{"stream":"regrind / densified plastic","end_market":null,"evidence":"company-reported"}],"capacity_licensed":null,"capacity_installed":null,"capacity_announced":null,"capacity_company_reported":null,"verified_throughput":null,"capacity_label":"unknown","evidence_level":"company_reported","last_verified":"2026-09-28","translations":{"summary":{"de":"AKTIVER TEILSTROM- / KUNSTSTOFFRECYCLER — keine spezialisierte Recyclinganlage für komplette Kunstrasenfelder. Laut Unternehmensangaben: Waschlinien, Verdichtung und Mahlen. Historische Genehmigung nennt eine zugelassene Abfallbehandlungsanlage mit Kunststoff-Waschlinien einschließlich Kunstrasen. HISTORISCHER ÖFFENTLICHER NACHWEIS — 2019: eine Studie im Auftrag der niederländischen Regierung dokumentierte die Verarbeitung getrennter Kunstrasenfasern von TUF Recycling (Dichtetrennung, Extrusion zu Granulat); dies bedeutet nicht, dass Route oder Mengen aktuell sind. Keine öffentliche kunstrasenspezifische Kapazität, verifizierte Durchsatzmenge oder Endverbleibstonnage ermittelt.","en":"ACTIVE PART-STREAM / PLASTICS RECYCLER — not a specialist full-field artificial-turf recycling plant. Company information: this site operates washing lines, densification and grinding. Historical permit evidence identifies it as an authorised waste-processing facility with plastic washing lines including artificial turf. HISTORICAL PUBLIC EVIDENCE — 2019: a Dutch government-commissioned study documented processing of separated artificial-turf fibres from TUF Recycling (density separation, extrusion into granulate); this route and its volumes are not implied to be current. No public artificial-turf-specific capacity, verified turf throughput or final-destination tonnage identified.","fr":"RECYCLEUR ACTIF DE FLUX PARTIELS / DE PLASTIQUES — pas une usine spécialisée de recyclage de terrains synthétiques complets. Selon l'entreprise : lignes de lavage, densification et broyage. Un permis historique identifie une installation autorisée de traitement de déchets avec lignes de lavage de plastiques, y compris le gazon synthétique. PREUVE PUBLIQUE HISTORIQUE — 2019 : une étude commandée par le gouvernement néerlandais a documenté le traitement de fibres séparées provenant de TUF Recycling (séparation par densité, extrusion en granulés) ; cela n'implique pas que cette filière ou ces volumes soient actuels. Aucune capacité spécifique au gazon synthétique, aucun débit vérifié ni tonnage de destination finale publics identifiés.","nl":"ACTIEVE DEELSTROOM- / KUNSTSTOFRECYCLER — geen gespecialiseerde recyclingfabriek voor volledige kunstgrasvelden. Volgens bedrijfsinformatie: waslijnen, verdichting en malen. Historische vergunning noemt een erkende afvalverwerkingsinrichting met kunststofwaslijnen, inclusief kunstgras. HISTORISCH OPENBAAR BEWIJS — 2019: een studie in opdracht van de Nederlandse overheid beschreef verwerking van gescheiden kunstgrasvezels van TUF Recycling (dichtheidsscheiding, extrusie tot granulaat); dit betekent niet dat deze route of volumes nu nog gelden. Geen openbare kunstgras-specifieke capaciteit, geverifieerde verwerkte hoeveelheid of eindbestemmingstonnage gevonden."},"classification":"ACTIVE PLASTICS PART-STREAM PROCESSOR — WASHING / GRINDING / DENSIFICATION"},"updated_at":"2026-09-29T07:49:42.079774+00:00","processor_category":"fixed","data_basis":["missing"],"missing_fields":["owner_name","capacity_licensed","capacity_installed","capacity_announced","capacity_company_reported","verified_throughput"]},{"slug":"carpetbeater-schuurman","name":"CarpetBeater / Schuurman Sport & Infra","operator_name":"Schuurman Sport & Infra","owner_name":null,"country_slug":"netherlands","city":null,"address":"Mobile on-site processing at sports-field locations — no fixed processing facility publicly demonstrated","lat":null,"lng":null,"location_status":"mobile_processor_no_fixed_facility","geocoding_method":null,"operational_status":"operational","accepted_streams":[],"accepted_materials":[],"processes":["turf uplift","mechanical beating / emptying of the turf carpet","separation of infill from turf","separation of infill layers (possible)","rolling / preparation of the emptied turf carpet","preparation of separated fractions for reuse or downstream processing"],"outputs":[{"stream":"note","end_market":"No final material recycling onsite claimed.","evidence":null},{"stream":"facility_type","end_market":"MOBILE PRE-PROCESSOR / ON-SITE MATERIAL-SEPARATION PROCESSOR — NOT A FULL-FIELD RECYCLER — NO FIXED FACILITY PIN","evidence":null}],"capacity_licensed":null,"capacity_installed":null,"capacity_announced":null,"capacity_company_reported":null,"verified_throughput":null,"capacity_label":"Capacity: UNKNOWN. Throughput: UNKNOWN. Not included in national fixed-facility capacity.","evidence_level":"company_reported","last_verified":null,"translations":{"summary":{"de":"Mobiler Vorbehandler / Materialtrennung vor Ort: Aufnahme des Kunstrasens, mechanisches Ausklopfen des Belags, Trennung des Einstreumaterials und Vorbereitung der Fraktionen auf dem Sportplatz. Kein Vollfeld-Recycler; keine feste Verarbeitungsanlage.","en":"Mobile pre-processor / on-site material-separation processor: turf uplift, mechanical beating of the carpet, infill separation and preparation of fractions at the sports field. Not a full-field recycler; no fixed processing facility.","fr":"Prétraitement mobile / séparation des matériaux sur site : dépose du gazon, battage mécanique du tapis, séparation du remplissage et préparation des fractions sur le terrain. Pas un recycleur de terrains complets ; aucune installation fixe.","nl":"Mobiele voorbewerker / materiaalscheiding op locatie: opnemen van kunstgras, mechanisch uitkloppen van de mat, scheiden van instrooimateriaal en voorbereiden van fracties op het sportveld. Geen volledige-veldrecycler; geen vaste verwerkingsinstallatie."}},"updated_at":"2026-09-29T07:49:42.079774+00:00","processor_category":"mobile","data_basis":["missing"],"missing_fields":["owner_name","city","lat","lng","geocoding_method","capacity_licensed","capacity_installed","capacity_announced","capacity_company_reported","verified_throughput","last_verified"]},{"slug":"domo-portugal","name":"Domo Portugal / Domo Sports Grass Portugal — mobile infill extraction / reuse (no fixed pin)","operator_name":"Domo Portugal / Domo Sports Grass Portugal","owner_name":null,"country_slug":"portugal","city":"Ribeira de Pena","address":"Ribeira de Pena (company base — mobile processing service; processing at project sites)","lat":null,"lng":null,"location_status":"mobile_processor_no_fixed_facility","geocoding_method":null,"operational_status":"operational","accepted_streams":[],"accepted_materials":["sand and rubber infill removed from synthetic-turf fields"],"processes":["mechanical vacuum extraction of sand and rubber infill","recovery / reuse assessment","reuse on another pitch where suitable"],"outputs":[{"stream":"facility_type","end_market":"MOBILE PRE-PROCESSOR / INFILL EXTRACTION AND REUSE — NOT A FIXED FULL-FIELD RECYCLER — NO FIXED PIN","evidence":null}],"capacity_licensed":null,"capacity_installed":null,"capacity_announced":null,"capacity_company_reported":null,"verified_throughput":null,"capacity_label":"unknown","evidence_level":"company_reported","last_verified":"2026-09-29","translations":{},"updated_at":"2026-09-29T14:36:02.184036+00:00","processor_category":"mobile","data_basis":["missing"],"missing_fields":["owner_name","lat","lng","geocoding_method","capacity_licensed","capacity_installed","capacity_announced","capacity_company_reported","verified_throughput"]},{"slug":"overdie-tiel","name":"Overdie — Tiel artificial-turf processing site","operator_name":"Overdie (current operator); Re-Match Nederland (historical operator, bankrupt — separate record)","owner_name":null,"country_slug":"netherlands","city":"Tiel","address":null,"lat":null,"lng":null,"location_status":"company_confirmed_operator_site_tiel","geocoding_method":null,"operational_status":"operational","accepted_streams":["sport"],"accepted_materials":[],"processes":[],"outputs":[{"stream":"capacity","end_market":"UNKNOWN","evidence":null},{"stream":"throughput","end_market":"UNKNOWN","evidence":null},{"stream":"evidence_note","end_market":"The current operator directly confirms that Overdie operates artificial-turf recycling/processing activities at the Tiel site in Q4 2026.","evidence":null},{"stream":"evidence_status","end_market":"COMPANY-CONFIRMED — DIRECT OPERATOR STATEMENT","evidence":null},{"stream":"methodology_note","end_market":"Unlike the standard CTE public-source evidence model, this operational status is based on a direct confirmation from the operator. It is therefore labelled company-confirmed and not independently verified.","evidence":null},{"stream":"output_fractions","end_market":"UNKNOWN","evidence":null},{"stream":"final_destination","end_market":"UNKNOWN","evidence":null},{"stream":"public_source_url","end_market":"none — direct operator statement","evidence":null},{"stream":"historical_operator","end_market":"Re-Match Nederland (HISTORICAL / BANKRUPT / CLOSED) — figures not transferred","evidence":null}],"capacity_licensed":null,"capacity_installed":null,"capacity_announced":null,"capacity_company_reported":null,"verified_throughput":null,"capacity_label":"COMPANY-CONFIRMED — DIRECT OPERATOR STATEMENT · CAPACITY: UNKNOWN · THROUGHPUT: UNKNOWN · Re-Match historical figures not transferred","evidence_level":"company_confirmed","last_verified":"2026-10-05","translations":{"type":{"de":"AKTIVER FESTER VERARBEITER — VOM UNTERNEHMEN BESTÄTIGT (nicht unabhängig verifiziert)","en":"ACTIVE FIXED PROCESSOR — COMPANY-CONFIRMED (not independently verified)","es":"PROCESADOR FIJO ACTIVO — CONFIRMADO POR LA EMPRESA (no verificado de forma independiente)","fr":"TRANSFORMATEUR FIXE ACTIF — CONFIRMÉ PAR L'ENTREPRISE (non vérifié de manière indépendante)","it":"IMPIANTO FISSO ATTIVO — CONFERMATO DALL'AZIENDA (non verificato in modo indipendente)","nl":"ACTIEVE VASTE VERWERKER — DOOR BEDRIJF BEVESTIGD (niet onafhankelijk geverifieerd)"},"summary":{"de":"VOM UNTERNEHMEN BESTÄTIGT — DIREKTE BETREIBERERKLÄRUNG. Der aktuelle Betreiber bestätigt direkt, dass Overdie im 4. Quartal 2026 am Standort Tiel Kunstrasen-Recycling-/Verarbeitungstätigkeiten durchführt. Anders als beim Standard-CTE-Modell auf Basis öffentlicher Quellen beruht dieser Betriebsstatus auf einer direkten Bestätigung des Betreibers. Er ist daher als vom Unternehmen bestätigt und nicht unabhängig verifiziert gekennzeichnet. Kapazität, Durchsatz, Outputfraktionen und Endbestimmung: UNBEKANNT. Re-Match Nederland (historisch, insolvent) bleibt ein separater Eintrag; dessen Zahlen werden nicht übertragen.","en":"COMPANY-CONFIRMED — DIRECT OPERATOR STATEMENT. The current operator directly confirms that Overdie operates artificial-turf recycling/processing activities at the Tiel site in Q4 2026. Unlike the standard CTE public-source evidence model, this operational status is based on a direct confirmation from the operator. It is therefore labelled company-confirmed and not independently verified. Capacity, throughput, output fractions and final destination: UNKNOWN. Re-Match Nederland (historical, bankrupt) is kept as a separate record; its figures are not transferred.","es":"CONFIRMADO POR LA EMPRESA — DECLARACIÓN DIRECTA DEL OPERADOR. El operador actual confirma directamente que Overdie realiza actividades de reciclaje/procesamiento de césped artificial en el sitio de Tiel en el 4.º trimestre de 2026. A diferencia del modelo estándar de CTE basado en fuentes públicas, este estado operativo se basa en una confirmación directa del operador. Por ello se etiqueta como confirmado por la empresa y no verificado de forma independiente. Capacidad, rendimiento, fracciones de salida y destino final: DESCONOCIDOS. Re-Match Nederland (histórico, en quiebra) se mantiene como registro separado; sus cifras no se transfieren.","fr":"CONFIRMÉ PAR L'ENTREPRISE — DÉCLARATION DIRECTE DE L'EXPLOITANT. L'exploitant actuel confirme directement qu'Overdie exerce des activités de recyclage/traitement de gazon synthétique sur le site de Tiel au 4e trimestre 2026. Contrairement au modèle standard de CTE fondé sur des sources publiques, ce statut opérationnel repose sur une confirmation directe de l'exploitant. Il est donc indiqué comme confirmé par l'entreprise et non vérifié de manière indépendante. Capacité, débit, fractions produites et destination finale : INCONNUS. Re-Match Nederland (historique, en faillite) reste un enregistrement distinct ; ses chiffres ne sont pas transférés.","it":"CONFERMATO DALL'AZIENDA — DICHIARAZIONE DIRETTA DELL'OPERATORE. L'operatore attuale conferma direttamente che Overdie svolge attività di riciclo/trattamento di erba sintetica presso il sito di Tiel nel 4º trimestre 2026. A differenza del modello standard CTE basato su fonti pubbliche, questo stato operativo si basa su una conferma diretta dell'operatore. È quindi etichettato come confermato dall'azienda e non verificato in modo indipendente. Capacità, quantità trattate, frazioni in uscita e destinazione finale: SCONOSCIUTE. Re-Match Nederland (storico, fallito) resta un record separato; i suoi dati non vengono trasferiti.","nl":"DOOR BEDRIJF BEVESTIGD — DIRECTE VERKLARING VAN DE EXPLOITANT. De huidige exploitant bevestigt rechtstreeks dat Overdie in Q4 2026 kunstgrasrecycling-/verwerkingsactiviteiten uitvoert op de locatie in Tiel. Anders dan het standaard CTE-model op basis van openbare bronnen is deze operationele status gebaseerd op een directe bevestiging van de exploitant. Daarom is deze gelabeld als door het bedrijf bevestigd en niet onafhankelijk geverifieerd. Capaciteit, verwerking, outputfracties en eindbestemming: ONBEKEND. Re-Match Nederland (historisch, failliet) blijft een apart record; de cijfers worden niet overgedragen."}},"updated_at":"2026-10-05T13:35:19.580396+00:00","processor_category":"fixed","data_basis":["missing"],"missing_fields":["owner_name","address","lat","lng","geocoding_method","capacity_licensed","capacity_installed","capacity_announced","capacity_company_reported","verified_throughput"]}]}