Method: installed sport-turf base (m²) × renovation cycle × historic filled-system mass (assumption: 28–35 kg/m²). Pitch equivalents use 7,000 m² per full-size pitch and are not an actual field count.

The numeric estimate is withheld until every model input can be traced to a public source. This is a model, not an official statistic.

01

Executive snapshot

DBU reports around 500 artificial-turf pitches in Denmark (2024/25). Current measured national end-of-life tonnage is UNKNOWN. Denmark has one currently verified active synthetic-turf recovery/processing site at Herning (HI-Park 415) under Turf Recycling ApS, while current capacity and throughput remain publicly unverified. Re-Match A/S is the historical operator at the same physical site; its operation was discontinued in December 2024.

Major caveat

The approx. 500 figure is a DBU football-pitch indication (2024/25) — not all synthetic turf, not landscape turf, not all small pitches, not a verified 2026 census. No EOL tonnage is calculated. Re-Match historical capacity and process data are not attached to Turf Recycling ApS. No other active processors identified to the current CTE evidence standard — not a statement that none exist.

02

Evidence status

Evidence status

Public source chain validated — frozen v1.0 (29 Sep 2026); data gaps remain

National EOL basis

UNKNOWN — NO MEASURED NATIONAL DATA

03

Market size & installed base

CURRENT

CURRENT PUBLICLY REPORTED FOOTBALL-PITCH STOCK: APPROX. 500 (DBU 2024/25 report; current public national football infrastructure indication).

HISTORICAL

HISTORICAL DBU FIGURES (different publications and scopes — not a growth series): 2007: 45 registered 11-a-side pitches · 2013: more than 220 11-a-side pitches · 2019: 358 11-a-side pitches + approx. 1,000 small pitches (estimate) · 2020: approx. 360 pitches + approx. 50 multi-pitches · 2023: approx. 400 pitches. The small-pitch estimate is not comparable to the 500-pitch figure. HISTORICAL DBU LIFETIME GUIDANCE: approx. 10–12 years.

MODELLED

No approved CTE model.

UNKNOWN

Current measured national EOL tonnage; current national annual replacement count.

04

End-of-life market

Publicly verified national tonnage

CURRENT MEASURED NATIONAL END-OF-LIFE TONNAGE: UNKNOWN

CTE MODEL — PUBLIC INPUTS

No approved CTE model.

HISTORICAL

None retained.

Uncertainty & methodology

Pitch counts are not converted to tonnes. The DBU lifetime guidance (approx. 10–12 years) is historical and is not used for a national EOL model.

05

Recycling infrastructure

Infrastructure

  • 0 Active full / multi-fraction recycling sites
  • 1 Active synthetic-turf processing / recovery sites (exact process not yet verified)
  • 0 Active part-stream processing sites
  • 0 Active pre-processors (incl. mobile, no fixed site)
  • 0 Historical / closed sites
  • 0 Development / permit projects

Public data availability

Public capacity available: NO

Actual throughput available: NO

Units and system definitions differ between facilities; CTE does not rank or total capacity.

06

Facility detail cards

Herning synthetic-turf recovery site — Turf Recycling ApS (former Re-Match Herning)

operationalACTIVE SYNTHETIC-TURF PROCESSOR / NON-HAZARDOUS WASTE-RECOVERY SITE

HI-Park 415, 7400 Herning, Denmark

What comes in?
DATA GAP
What happens?
downsizing, cleaning, separation
What comes out?
sand · rubber · backing · plastic fibre (historical company description (Re-Match 2021 prospectus))
Where does it go?
UNKNOWN
Capacity
DATA GAP NO PUBLIC FIGURE IDENTIFIED
Throughput
DATA GAP UNKNOWN
Evidence type
company reported
Last verified
2026-09-29
Data gaps
Capacity · Throughput

Secondary material market / circular value chain (not recycling infrastructure)

These actors do not physically process end-of-life synthetic turf. They are excluded from recycler counts, the recycler map and capacity figures.

  • Genan A/S (tyre recycler — COLLECTION / RECYCLING SERVICE ACTOR — NOT A RECYCLER

07

Material flow

Only steps supported by public evidence are filled. Energy recovery is not material recycling; export and storage are not final destinations.

  1. 1. Field

    PUBLIC EVIDENCE

  2. 2. Removal

    UNKNOWN

  3. 3. Infill separation

    UNKNOWN

  4. 4. Turf carpet

    UNKNOWN

  5. 5. Processing

    PUBLIC EVIDENCE

    Active site: Turf Recycling ApS, HI-Park 415, Herning — non-hazardous waste recovery (K 206), physically inspected 4 Jun 2026; exact current process not publicly verified. Historical Re-Match process (EuCertPlast 2021): crushing · dry washing · grinding · sieving.

  6. 6. Output fractions

    HISTORICAL

    Historical Re-Match outputs: PE / PP / PE-PP fibres (EuCertPlast 2021); other historical descriptions also mention sand · rubber · backing · plastic fibre. Current outputs UNKNOWN.

  7. 7. Secondary material

    UNKNOWN

  8. 8. Final destination

    UNKNOWN

08

Capacity vs throughput

These categories are never added together: capacity is not throughput, a target is not a realised volume, and historical data is not current data.

KNOWN CAPACITY

CURRENT VERIFIED SYNTHETIC-TURF RECYCLING CAPACITY: UNKNOWN (Turf Recycling ApS — no current capacity figure validated). Historical Re-Match claims (not current, not Turf Recycling ApS): 25,000 t/year nominal certified plastics process (EuCertPlast 2021) · 26,800 t/year input · 24,200 t/year output · 4 t/hour · 40,000 t/year industry-reported. Historical public capacity claims differ by source and scope; not averaged.

KNOWN THROUGHPUT

CURRENT VERIFIED NATIONAL THROUGHPUT: UNKNOWN. Historical only: 25,631 t post-consumer material accepted for the certified process in 2021 (EuCertPlast, Re-Match) — not current, not 2026, not Turf Recycling ApS.

UNKNOWN THROUGHPUT

Turf Recycling ApS current capacity, throughput and processing rate.

HISTORICAL

Re-Match A/S, Herning — HISTORICAL OPERATOR (operation discontinued Dec 2024; NOT attached to Turf Recycling ApS; excluded from active capacity, never summed or averaged): approx. 26,800 t/year input / approx. 24,200 t/year output — COMPANY-REPORTED HISTORICAL DESIGN / OPERATING CAPACITY (2021 prospectus); 4 t/hour — COMPANY-REPORTED HISTORICAL PROCESSING RATE (not converted to t/year); 40,000 t/year — INDUSTRY-REPORTED HISTORICAL CAPACITY CLAIM (ESTC). HISTORICAL CAPACITY CLAIMS DIFFER BETWEEN PUBLIC SOURCES. 70–75% — COMPANY-REPORTED HISTORICAL RECOVERY RATE (not a material recycling rate). 662 pitches by 30 Sep 2021 — COMPANY-REPORTED CUMULATIVE HISTORICAL ACTIVITY (not annual throughput).

TARGETS

None.

09

Regulatory context

Current (Danish Environmental Protection Agency / Miljøstyrelsen): rubber granulate used as artificial-turf infill is microplastic; EU restrictions prohibit the sale of microplastic infill for artificial turf from 17 October 2031. This is not a ban on existing pitches and not a ban on artificial turf. Historical (Danish EPA 2018 guidance): used synthetic turf classified as waste would typically use EAK / EWC 17 09 04, and recyclable materials should generally be directed to material recovery rather than incineration or landfill where technically possible — historical waste-guidance context, not a 2026 legal opinion.

10

Data gaps

NO PUBLICLY VERIFIED VALUE AVAILABLE — an unknown is a deliberate evidence status, not a missing page element.

  • DATA GAPCURRENT MEASURED NATIONAL EOL TONNAGE — UNKNOWN
  • DATA GAPCURRENT NATIONAL ANNUAL REPLACEMENT COUNT — UNKNOWN
  • DATA GAPTURF RECYCLING APS — CURRENT CAPACITY, THROUGHPUT, PROCESSING RATE AND EXACT PROCESS — UNKNOWN
  • DATA GAPOTHER ACTIVE PHYSICAL PROCESSORS — NONE IDENTIFIED TO CURRENT CTE EVIDENCE STANDARD
  • DATA GAPLANDSCAPE, HYBRID AND LEISURE TURF — EOL VOLUME AND ROUTE UNKNOWN

11

Sources

Public source chain (30)PUBLIC SOURCE CHAIN VALIDATED — DATA GAPS REMAIN

Each statement: claim → public source → date → evidence label → limitation. Figures are shown separately and never added together.

  • HISTORICAL TECHNICAL GUIDANCE / TYPICAL SYSTEM EXAMPLE — not universal, not current national composition, not a CTE conversion factor · official_source_verified

    Danish EPA 2018 guidance example of a used artificial-turf system: turf carpet approx. 10% by weight after infill removal, infill approx. 90%; within the example infill approx. 33% granulate and approx. 66% quartz sand.

    Sources: [1] www2.mst.dk

  • HISTORICAL OPERATOR EVENT — COMPANY-REPORTED · company_reported

    In April 2023 Re-Match announced that its Danish (Herning) factory had resumed full production after reduced operations during the 2022 energy-price crisis.

    Sources: [1] re-match.com

  • HISTORICAL — CLOSURE ANNOUNCEMENT · company_reported

    On 23 December 2024 Re-Match announced that operations at the Herning factory would be discontinued and that the Danish subsidiary had filed for restructuring.

    Sources: [1] re-match.com

  • HISTORICAL / CLOSED / UNDER BANKRUPTCY — legal-entity and physical-facility status kept separate · official_source_verified

    Danish company-register-derived data: reconstruction status registered 20 December 2024; bankruptcy registered 4 June 2025; former operating entity Re-Match A/S / later ialwfan 2024 A/S; current status UNDER BANKRUPTCY. The holding company still exists; holding company active does NOT mean Herning factory active.

    Sources: [1] danskcvrapi.dk [2] proff.dk

  • HISTORICAL RE-MATCH PROCESS · third_party_certified

    Historical Re-Match process at HI-Park 415, Herning (EuCertPlast audit, 2021): crushing, dry washing, grinding and sieving of dismantled artificial-turf pitches; certified recycled output PE fibres, PP fibres and PE/PP fibres. Other historical Re-Match descriptions also mention sand, rubber, backing and plastic fibre. Not verified as the current Turf Recycling ApS process.

    Sources: [1] re-match.com

  • COMPANY-REPORTED HISTORICAL DESIGN / OPERATING CAPACITY (2021) — not throughput · company_reported

    Re-Match 2021 prospectus: approximately 26,800 t/year input capacity and approximately 24,200 t/year output capacity.

    Sources: [1] re-match.com

  • COMPANY-REPORTED HISTORICAL PROCESSING RATE — not converted to t/year · company_reported

    Re-Match prospectus: 4 t/hour processing rate.

    Sources: [1] re-match.com

  • INDUSTRY-REPORTED HISTORICAL CAPACITY CLAIM — differs from 26,800 t/year; neither selected, not averaged · industry_reported

    ESTC historical publication: 40,000 t/year capacity for the Re-Match Herning facility.

    Sources: [1] estc.info

  • COMPANY-REPORTED HISTORICAL RECOVERY RATE — not current performance, not a material recycling rate · company_reported

    Re-Match 2021 prospectus: 70–75% recovery rate on input material depending on pitch quality and infill.

    Sources: [1] re-match.com

  • COMPANY-REPORTED CUMULATIVE HISTORICAL ACTIVITY — not annual throughput · company_reported

    Re-Match prospectus: by 30 September 2021 the Herning factory had processed/recycled 662 artificial-turf pitches.

    Sources: [1] re-match.com

  • THIRD-PARTY-CERTIFIED HISTORICAL NOMINAL PLASTICS-RECYCLING CAPACITY · third_party_certified

    EuCertPlast audit (period 1 Jan–31 Dec 2021; audit date 17 Feb 2022): nominal capacity 25,000 t/year for the certified plastics-recycling process at ReMatch A/S, HI-Park 415, Herning. Not total full-field intake capacity; not Turf Recycling ApS capacity.

    Sources: [1] re-match.com

  • THIRD-PARTY-CERTIFIED HISTORICAL POST-CONSUMER INPUT FOR THE CERTIFIED PROCESS · third_party_certified

    EuCertPlast audit: 25,631 t of post-consumer material accepted for recycling during the previous 12 months (evaluation period 2021) for the certified process. Not current throughput, not 2026 throughput, not Turf Recycling ApS throughput.

    Sources: [1] re-match.com

  • HISTORICAL CERTIFIED PLASTICS OUTPUT CHARACTERISATION · third_party_certified

    EuCertPlast audit: certified recycled output PE fibres, PP fibres and PE/PP fibres; post-consumer recycled output 100% — this refers to the recycled content/origin of the certified output, not a total field recycling rate.

    Sources: [1] re-match.com

  • ACTIVE PHYSICAL WASTE-RECOVERY / SYNTHETIC-TURF PROCESSING SITE — REGULATORY / PHYSICAL INSPECTION VERIFIED · official_source_verified

    DMA 2026 record: operator Turf Recycling ApS (CVR 45905284) at HI-Park 415, 7400 Herning; main activity K 206 — installation recovering non-hazardous waste; Herning Kommune performed a physical inspection on 4 June 2026 (published 16 June 2026).

    Sources: [1] dma.mst.dk

  • CURRENT COMPANY-REGISTER RECORD · official_source_verified

    Turf Recycling ApS (CVR 45905284): established 19 September 2025; registered status active / normal; registered purpose includes recycling / waste-recovery activities, including reuse/recycling of artificial-grass pitches; registered company seat Lundborgvej 25, 8800 Viborg (company seat — NOT the processing-facility address).

    Sources: [1] cvrlookup.dk

  • CTE DATA GAP / AUDIT CONCLUSION · cte_audit

    Active synthetic-turf recycling / recovery site; exact current process configuration not yet publicly verified by CTE. Current processing capacity, current verified throughput and current processing rate: UNKNOWN. Re-Match historical figures are not transferred to Turf Recycling ApS.

  • CTE DATA GAP / AUDIT CONCLUSION · cte_audit

    Other active physical synthetic-turf processors in Denmark (fixed full-field, carpet, infill, turf-derived plastics part-stream, mobile pre-processors): none identified to the current CTE evidence standard. This is not a statement that none exist.

  • CTE DATA GAP / AUDIT CONCLUSION · cte_audit

    Denmark: current measured national EOL tonnage, current annual replacement count, current verified national recycling capacity, current verified national throughput, and landscape, hybrid and leisure turf EOL volumes and routes: UNKNOWN. No national model.

  • HISTORICAL INFILL DATA — not current 2026 market shares · official_source_verified

    2017 Danish EPA survey: 81% of surveyed artificial-turf pitches used SBR; 94% of known third-generation pitches used SBR infill; an older 2008 Danish reference gives 98%.

    Sources: [1] www2.mst.dk

  • HISTORICAL DBU LIFETIME GUIDANCE — not used for a national EOL model · official_source_verified

    DBU historical guidance: average artificial-turf pitch lifetime approximately 10–12 years.

    Sources: [1] dbu.dk

  • CURRENT PUBLIC FOOTBALL-INFRASTRUCTURE INDICATION (2024/25) — not a full census, not landscape turf, not a complete small-pitch inventory, not a verified 2026 census · official_source_verified

    DBU reports around 500 artificial-turf pitches in Denmark.

    Sources: [1] dbu.dk

  • CURRENT MARKET / TECHNOLOGY TRANSITION CONTEXT — player-experience rankings not used as CTE policy conclusions · official_source_verified

    DBU 2024/25: Denmark is testing alternative systems ahead of the microplastic-infill sales restriction; the programme includes rubber infill, cork, non-infill systems and mixed alternatives.

    Sources: [1] dbu.dk

  • HISTORICAL DBU PITCH DATA — different publication/scope · official_source_verified

    2007: 45 registered 11-a-side artificial-turf pitches (DBU).

    Sources: [1] dbu.dk

  • HISTORICAL DBU PITCH DATA — different publication/scope · official_source_verified

    2013: more than 220 11-a-side artificial-turf pitches (DBU).

    Sources: [1] dbu.dk

  • HISTORICAL DBU PITCH DATA — small-pitch estimate not comparable to the later 500-pitch figure · official_source_verified

    2019: 358 11-a-side pitches plus approximately 1,000 small pitches (estimate) (DBU).

    Sources: [1] dbu.dk

  • HISTORICAL DBU PITCH DATA — different publication/scope · official_source_verified

    2020: approximately 360 artificial-turf pitches plus approximately 50 multi-pitches (DBU).

    Sources: [1] dbu.dk

  • HISTORICAL DBU PITCH DATA — different publication/scope · official_source_verified

    2023: approximately 400 artificial-turf pitches (DBU).

    Sources: [1] dbu.dk

  • CURRENT REGULATORY CONTEXT · official_source_verified

    Danish Environmental Protection Agency: rubber granulate used as artificial-turf infill is microplastic; EU restrictions prohibit the sale of microplastic infill for artificial turf from 17 October 2031 (not a ban on existing pitches).

    Sources: [1] mst.dk

  • SECONDARY MATERIAL / INFILL SUPPLY CONTEXT — EXCLUDED FROM RECYCLER INFRASTRUCTURE · company_reported

    Genan A/S mechanically recycles end-of-life tyres; its recycled rubber products are used as artificial-turf infill, e-layer and in other rubber applications. Classification: upstream recycled material supplier / secondary raw-material producer — NOT a synthetic-turf recycler and NOT a turf-derived part-stream processor.

    Sources: [1] genan.dk [2] genan.dk

  • HISTORICAL DANISH WASTE-GUIDANCE CONTEXT — not a 2026 legal opinion · official_source_verified

    Miljøstyrelsen's 2018 guidance stated that used artificial turf would typically be assigned EAK 17 09 04 when classified as waste. This is historical guidance, not a 2026 legal determination.

    Sources: [1] www2.mst.dk

All public sources (deduplicated) (19)

Each URL is listed once; the claim-source links above are preserved per statement.

  1. Danish CVR (company register) — derived record — CVR record — Turf Recycling ApS, CVR 45905284 · cvrlookup.dk · 1 statements
  2. Danish CVR (company register) — derived record — CVR-derived record — ialwfan 2024 A/S (former Re-Match A/S), CVR 41983426 · danskcvrapi.dk · 1 statements
  3. Danish Football Association (DBU) — DBU — Boom i kunstgræsbaner en stor gevinst (Dec 2014) · dbu.dk · 2 statements
  4. Danish Football Association (DBU) — DBU — Granulatet skal blive på kunstbanen (Aug 2019) · dbu.dk · 1 statements
  5. Danish Football Association (DBU) — DBU — Invester i fodboldfaciliteter nu (Apr 2020) · dbu.dk · 2 statements
  6. Danish Football Association (DBU) — Spiloplevelsen på alternative kunstgræsbaner — DBU's Nationale Testprogram (2024/25, published October 2025) · dbu.dk · 2 statements
  7. Danish Football Association (DBU) — DBU — EU-afstemning om mulig udfasning af gummigranulat (Feb 2023) · dbu.dk · 1 statements
  8. Danish Digital Environmental Administration (DMA / Miljøstyrelsen) — DMA case 2388095 — Turf Recycling ApS, HI-Park 415, Herning (inspection 4 Jun 2026) · dma.mst.dk · 1 statements
  9. ESTC — ESTC — Re-Match to build 24 factories, starting in the Netherlands · estc.info · 1 statements
  10. Genan — Genan — company website · genan.dk · 1 statements
  11. Genan — Genan — Kunstgræsbaner (artificial-turf application) · genan.dk · 1 statements
  12. Danish Environmental Protection Agency (Miljøstyrelsen) — Kunstgræs-fodboldbaner (current artificial-turf / microplastic page) · mst.dk · 1 statements
  13. Proff — Proff company record — ialwfan 2024 A/S, Herning · proff.dk · 1 statements
  14. Re-Match — Re-Match Holding prospectus (3 Dec 2021) · re-match.com · 4 statements
  15. Re-Match — Re-Match's Danish factory resumes full production (April 2023) · re-match.com · 1 statements
  16. Re-Match — Re-Match files for a non-group-based local restructuring in Denmark and discontinues its operations at the Herning factory (23 Dec 2024) · re-match.com · 1 statements
  17. EuCertPlast (audit document published by Re-Match) — EuCertPlast audit — ReMatch A/S, HI-Park 415, 7400 Herning (audit period 2021, audit date 17 Feb 2022) · re-match.com · 4 statements
  18. Danish Football Association (DBU) — Miljøstyrelsen 2017 survey of artificial-turf pitches · www2.mst.dk · 1 statements
  19. Danish Environmental Protection Agency (Miljøstyrelsen) — Miljøstyrelsen 2018 artificial-turf guidance · www2.mst.dk · 2 statements

12

CTE data quality

Claims

30

Sources

19

Claim-source links

29

Facilities

1

Official / regulatory sources

3

Last audited

2026-09-29

Final status: QA PASSED WITH DOCUMENTED UNKNOWN — QA PASSED — FROZEN (v1.0.1, 29 Sep 2026)