Skip to main content

Countries

Artificial turf recycling in Romania

Recycling infrastructure, regulation, material flows and end-of-life status.

Dataset: FROZEN v1.0Verified: 2026-09-30Sources: 21QA: QA PASSED WITH DOCUMENTED UNKNOWN

01

Executive snapshot

Romania has a substantial and expanding artificial-turf football base, evidenced by two separate programmes: the FRF county programme (≈20 pitches completed by August 2026, goal one per county) and the CNI sports-base programme (40 bases completed, almost 60 under completion, ≈50 awaiting approval as of March 2025; target 400 fields). These are programme datasets, never added into a national headline. Current national stock, EOL tonnage, replacements, capacity, throughput and treatment split are UNKNOWN. General Sport Field removes and separates infill on site with a RenoMatic RM1502 — a mobile pre-processor, not a full-field recycler. CTE has not identified a currently active Romanian fixed full-field synthetic-turf recycling facility that meets the CTE public-evidence standard.

Major caveat

FRF (≈20) and CNI (40 / ~60 / ~50) are separate programmes, never added; programme target 400 ≠ completed pitches; one CNI Type-1 base = one standard synthetic pitch + one 40 × 20 m multifunctional field (surface not assumed). Project value ≠ recycling cost. Individual tenders ≠ national replacement rate; 1,360 m² ≠ average pitch. Infill removal ≠ recycling; prepared for recycling ≠ recycled. Installer / contractor ≠ recycler. 'Recyclable' ≠ recycled. SYNLawn / FormaTurf Germany claim ≠ Romanian capacity or national flow. Tyre recycling (Eco Anvelope, ARCON) ≠ turf recycling. Office / contact address ≠ processing site. No universal waste code. 0 fixed pins ≠ no turf recycling; no ranking.

02

Evidence status

Evidence status

v1.0 (30 Sep 2026) — national stock, area, EOL tonnage, replacements, capacity, throughput and treatment split UNKNOWN; FRF / CNI programme data KNOWN (separate); 0 fixed turf processors; 1 mobile pre-processor (General Sport Field)

National EOL basis

Project-specific replacement evidence only (Iclod 2026, UAIC 2023, TUIASI 2019) — national EOL tonnage and replacements UNKNOWN

03

Market size & installed base

CURRENT

CURRENT VERIFIED NATIONAL ARTIFICIAL-TURF PITCH COUNT: UNKNOWN · AREA: UNKNOWN. FRF county programme (18 Aug 2026): ≈20 artificial-turf pitches completed toward one per county (includes Zalău). CNI sports-base programme (17 Mar 2025): 40 bases completed, almost 60 under completion, ≈50 awaiting approval; Type-1 base = one standard synthetic pitch + one 40 × 20 m multifunctional field. Project examples: Suceava 2025 (UEFA-size synthetic pitch, ≈EUR 1.1m), Reghin 2025. Programme data only — not a national census.

HISTORICAL

PROGRAMME TARGET ONLY, NOT STOCK: EURO 2020-linked programme of 400 grassroots football fields (300 in 150 sports bases + 100 at schools).

MODELLED

No CTE stock model. Legacy desk model archived.

UNKNOWN

Current complete national stock and area; municipal, school, minifootball, private, landscape, padel, tennis, multisport and hybrid turf.

04

End-of-life market

Publicly verified national tonnage

MEASURED NATIONAL EOL TONNAGE: UNKNOWN. COMPLETE NATIONAL ANNUAL REPLACEMENTS: UNKNOWN. Project-specific replacement evidence only (not summed): Iclod Arena synthetic-turf replacement tender (11 May 2026); UAIC Iași pitch-surface replacement (2023); TUIASI Iași 1,360 m² replacement (2019). Old-turf destination in these projects: UNKNOWN.

CTE MODEL — PUBLIC INPUTS

No Romania EOL model in v1.0 (no FRF / CNI field count × assumed field weight ÷ assumed lifetime; programmes ≠ national stock; sizes, systems, infill and installation years differ).

HISTORICAL

Legacy CTE desk estimate (12,000 t/y) archived 30 Sep 2026.

Uncertainty & methodology

Treatment split (reuse, material recycling, energy recovery, landfill / disposal, export): UNKNOWN — no chart. Export volumes and destination countries: UNKNOWN.

05

Recycling infrastructure

Infrastructure

  • 0 Active full / multi-fraction recycling sites
  • 0 Active part-stream processing sites
  • 1 Active pre-processors (incl. mobile, no fixed site)
  • 0 Historical / closed sites
  • 0 Development / permit projects

Public data availability

Public capacity available: NO

Actual throughput available: NO

Units and system definitions differ between facilities; CTE does not rank or total capacity.

NO CURRENT FIXED ROMANIAN END-OF-LIFE SYNTHETIC-TURF MATERIAL-RECYCLING FACILITY VERIFIED TO CTE PUBLIC-EVIDENCE STANDARD. Fixed turf-recycler pins: 0. General Sport Field is listed as a mobile pre-processor without a fixed pin (Bucharest and Dorohoi addresses are company / contact locations). Not pinned: SYNLawn, FormaTurf, Eco Anvelope, ARCON, contractors and pitches.

06

Facility detail cards

GENERAL SPORT FIELD (GSF) — mobile pre-processor / on-site material separation (no fixed facility pin)

operationalMOBILE PRE-PROCESSOR / MATERIAL-SEPARATION PROCESSOR — NOT A FULL-FIELD MATERIAL RECYCLER — NO FIXED FACILITY PIN

COMPANY / CONTACT LOCATIONS — MOBILE PROCESSING SERVICE (Strada Levănțica 69, Bucharest; Aprodul Purice 5D, Dorohoi; text only, no pin)

What comes in?
end-of-life synthetic turf at project sites (sand, rubber granulate, organic infill, turf carpet)
What happens?
artificial-turf deinstallation with RenoMatic RM1502, infill removal and separation (filters, vibration, blowers), fibre shredding / cutting (company-reported), sand / rubber filtering, classifying, sorting (company-reported)
What comes out?
synthetic fibres (company-reported); sand (company-reported); rubber granulate / organic infill (company-reported)
Where does it go?
PREPARED FOR RECYCLING / REUSE — final destination UNKNOWN; UNKNOWN; UNKNOWN
Capacity
DATA GAP NO PUBLIC FIGURE IDENTIFIED
Throughput
DATA GAP UNKNOWN
Evidence type
company reported
Last verified
2026-09-30
Data gaps
Capacity · Throughput

Secondary material market / circular value chain (not recycling infrastructure)

These actors do not physically process end-of-life synthetic turf. They are excluded from recycler counts, the recycler map and capacity figures.

  • SYNLawn Romania — ARTIFICIAL-TURF PRODUCT / INSTALLATION ACTOR + EXTERNAL RECYCLING-ROUTE CLAIM — NOT A ROMANIAN RECYCLER
  • Eco Anvelope — TYRE-WASTE SYSTEM / UPSTREAM CIRCULAR-RUBBER ACTOR — NOT A SYNTHETIC-TURF RECYCLER
  • ARCON Environmental — TYRE-RECYCLING TECHNOLOGY / UPSTREAM MATERIAL CONTEXT — NOT A TURF PROCESSOR

07

Material flow

Only steps supported by public evidence are filled. Energy recovery is not material recycling; export and storage are not final destinations.

  1. 1. Field

    PUBLIC EVIDENCE

    FRF / CNI programme data documented; current complete national stock UNKNOWN.

  2. 2. Removal

    PUBLIC EVIDENCE

    Project-specific replacements documented (Iclod 2026, UAIC 2023, TUIASI 2019); national count UNKNOWN.

  3. 3. Infill separation

    PUBLIC EVIDENCE

    GSF on-site infill removal and separation (RenoMatic RM1502, company-documented); infill destination UNKNOWN.

  4. 4. Turf carpet

    UNKNOWN

    Fibres may be shredded / cut (company-reported); carpet destination UNKNOWN.

  5. 5. Processing

    PUBLIC EVIDENCE

    1 mobile pre-processor (GSF); 0 fixed full-field or part-stream processors.

  6. 6. Output fractions

    UNKNOWN

    No verified material-recycling output fractions.

  7. 7. Secondary material

    UNKNOWN

    Tyre-derived rubber (Eco Anvelope, ARCON) is upstream supply, not turf recycling.

  8. 8. Final destination

    UNKNOWN

    National destination split UNKNOWN; SYNLawn / FormaTurf claim ≠ national flow.

08

Capacity vs throughput

These categories are never added together: capacity is not throughput, a target is not a realised volume, and historical data is not current data.

KNOWN CAPACITY

CURRENT VERIFIED NATIONAL TURF-RECYCLING CAPACITY: UNKNOWN. GSF annual capacity: UNKNOWN.

KNOWN THROUGHPUT

CURRENT VERIFIED NATIONAL TURF-RECYCLING THROUGHPUT: UNKNOWN. GSF annual throughput: UNKNOWN.

UNKNOWN THROUGHPUT

No numeric capacity or throughput is published; not derived from machine type, experience (>15 years in sports-field work), portfolio or project count. Tyre / rubber capacity and FormaTurf's German capacity are not Romanian turf capacity.

HISTORICAL

None.

TARGETS

FRF goal: one artificial-turf pitch per county; CNI target: 400 fields (construction targets, not recycling targets). No national synthetic-turf recycling target identified.

09

Regulatory context

ROMANIA — REGULATORY CONTEXT. Current national waste framework: Emergency Ordinance (OUG) 92/2021 on the waste regime, which largely replaced Law 211/2011. Waste list HG 856/2002 includes 17 02 03 plastics and 17 09 04 mixed C&D waste; a universal Romanian EOL-turf waste code is NOT ESTABLISHED and turf-fraction End-of-Waste status is NOT GENERALLY VERIFIED. From 17 October 2031, granular polymeric infill for synthetic sports surfaces may no longer be placed on the EU market (Regulation (EU) 2023/2055) — not a turf ban and no removal obligation for existing infill. A 2026 Bucharest Sector 5 council document still lists SBR / EPDM infill for maintenance.

10

Data gaps

NO PUBLICLY VERIFIED VALUE AVAILABLE — an unknown is a deliberate evidence status, not a missing page element.

  • DATA GAPCURRENT COMPLETE NATIONAL STOCK AND AREA — UNKNOWN
  • DATA GAPMEASURED EOL TONNAGE AND NATIONAL REPLACEMENTS — UNKNOWN
  • DATA GAPNATIONAL AND GSF CAPACITY / THROUGHPUT — UNKNOWN
  • DATA GAPTREATMENT SPLIT — UNKNOWN
  • DATA GAPDESTINATIONS OF CARPET, SAND, SBR / EPDM / TPE AND ORGANIC INFILL — UNKNOWN
  • DATA GAPEXPORT VOLUMES AND DESTINATION COUNTRIES — UNKNOWN
  • DATA GAPLANDSCAPE, HYBRID, PADEL, TENNIS AND MULTISPORT TURF — UNKNOWN
  • DATA GAPUNIVERSAL TURF WASTE CODE — NOT ESTABLISHED

11

Sources

Public source chain (26)PUBLIC SOURCE CHAIN VALIDATED — DATA GAPS REMAIN

Each statement: claim → public source → date → evidence label → limitation. Figures are shown separately and never added together.

  • TYRE-RECYCLING TECHNOLOGY / UPSTREAM MATERIAL CONTEXT · company_reported

    ARCON Environmental markets tyre-recycling technology producing tyre chips, rubber granulate and rubber powder, with applications including artificial turf. Upstream technology context — not a Romanian turf EOL processor; excluded from turf recycler count, map, capacity and throughput.

    Sources: [1] arcon-environmental.com.ro

  • CTE DATA GAP / AUDIT CONCLUSION · unknown

    Current verified national turf-recycling capacity: UNKNOWN. Throughput: UNKNOWN. GSF capacity and throughput: UNKNOWN — not derived from machine type, company experience, website portfolio or number of projects. Tyre / rubber-recycling capacity and FormaTurf's German capacity are not Romanian turf capacity. Project values are not capacity.

  • CURRENT CNI TYPE-1 BASE PROGRAMME ACTIVITY · official_source_verified

    CNI procurement notice 1897 (Băneasa) documents current implementation activity in the CNI Type-1 sports-base programme. Implementation context — not a pitch count.

    Sources: [1] achizitii.cni.ro

  • CNI / GOVERNMENT NATIONAL SPORTS-INFRASTRUCTURE PROGRAMME STATUS (MARCH 2025) · official_source_verified

    FRF (17 March 2025, Dej): in the CNI sports-base programme, 40 sports bases were completed, almost 60 were still being completed and approximately 50 were awaiting approval. Each Type-1 base includes one standard-size synthetic football pitch, floodlighting, stands, changing facilities, parking and one smaller 40 × 20 m multifunctional field (surface type not assumed; not counted as a second turf pitch). Programme status — not national stock.

    Sources: [1] frf.ro

  • PROGRAMME TARGET / DESIGN · official_source_verified

    FRF describes the broader EURO 2020-linked programme as 400 football fields for grassroots football, including 300 fields within 150 sports bases and 100 fields at schools. Programme target — not completed current stock and not 400 existing artificial-turf pitches.

    Sources: [1] frf.ro

  • CTE DATA GAP / AUDIT CONCLUSION · unknown

    National treatment split (reuse, material recycling, energy recovery, landfill / disposal, export): UNKNOWN — no chart. National destinations of turf carpet, sand, SBR / EPDM / TPE and organic infill: UNKNOWN. Current measured EOL exports and destination countries: UNKNOWN; the SYNLawn / FormaTurf relationship does not establish national Romania → Germany flows, and Hungary, Bulgaria, Germany, Poland, the Netherlands or Italy are not inferred.

  • TYRE-WASTE SYSTEM / UPSTREAM CIRCULAR-RUBBER ACTOR · company_reported

    Eco Anvelope (national end-of-life tyre management / producer-responsibility actor) states that used tyres can be cut, shredded, granulated or ground into rubber granules / powder, and that products from used-tyre processing may become raw material for rubber mats, sports surfaces and artificial turf. Tyre → recycled rubber → artificial turf is upstream material supply, not artificial turf → recycling; not a turf recycler, not counted as used-infill recycling.

    Sources: [1] ecoanvelope.ro [2] ecoanvelope.ro [3] ecoanvelope.ro

  • CTE DATA GAP / AUDIT CONCLUSION · unknown

    Current measured national EOL tonnage: UNKNOWN. Current complete national annual replacement count: UNKNOWN. Current national treatment split: UNKNOWN. No Romania tonnes/year model in v1.0 — FRF / CNI field counts are not multiplied by an assumed field weight or divided by an assumed lifetime.

  • CURRENT EU / ROMANIAN REGULATORY CONTEXT · official_source_verified

    From 17 October 2031, granular polymeric infill for synthetic sports surfaces may no longer be placed on the EU market (Regulation (EU) 2023/2055, applicable in Romania as an EU Member State). This is not a ban on artificial turf, does not make existing synthetic fields illegal and does not require existing rubber infill to be removed in 2031.

    Sources: [1] eur-lex.europa.eu

  • CURRENT FRF PROGRAMME OUTPUT · official_source_verified

    FRF (18 August 2026): its programme began about 8 years earlier with the goal of one artificial-turf football pitch in every Romanian county; by August 2026 approximately 20 such pitches had been completed. The new Zalău base (Sălaj County) includes 1 artificial and 1 natural-grass football field and is not counted separately from the ≈20. FRF states these fields are in addition to CNI-supported sports bases. ≈20 ≠ national artificial-turf stock.

    Sources: [1] frf.ro

  • COMPANY-REPORTED POTENTIAL APPLICATIONS AND EXPERIENCE · company_reported

    GSF company claims: separated materials can be reintegrated into artificial-turf applications, construction fill or landscaping; the company has more than 15 years of experience in sports-field construction / maintenance. Prepared for recycling ≠ proven final recycling; actual fraction-specific destinations: UNKNOWN; 15 years ≠ 15 years of EOL turf recycling. No fixed final plastics-recycling line, mass balance, secondary-polymer production or End-of-Waste status is proven.

    Sources: [1] mentenanta-gazon.ro [2] mentenanta-gazon.ro

  • ACTIVE MOBILE / PROJECT-BASED TURF PRE-PROCESSOR / MATERIAL SEPARATION (COMPANY-DOCUMENTED) · company_reported

    GENERAL SPORT FIELD (GSF), active (contact locations Bucharest and Dorohoi / Botoșani County): describes artificial-turf deinstallation with a RenoMatic RM1502 that removes and separates sand, rubber granulate and other organic infill from the carpet, using filters, vibration systems and blowers to separate synthetic fibres from rubber + sand. After separation, fibres may be shredded / cut and rubber and sand filtered, classified and sorted to prepare materials for recycling or reuse. CTE classification: mobile pre-processor / material-separation processor — not a full-field recycler; no fixed pin (addresses are company / contact locations). Capacity and throughput: UNKNOWN.

    Sources: [1] mentenanta-gazon.ro [2] mentenanta-gazon.ro

  • CURRENT MUNICIPAL ARTIFICIAL-TURF REPLACEMENT PROJECT · official_source_verified

    Iclod municipality, 11 May 2026: invitation to tender 'Înlocuire gazon sintetic Iclod Arena' (synthetic-turf replacement), with invitation PDF and technical specification (caiet de sarcini). Primary municipal procurement evidence; old-turf destination, recycling / reuse rate and tonnage: UNKNOWN.

    Sources: [1] primariaiclod.ro [2] primariaiclod.ro

  • CTE DATA GAP / AUDIT CONCLUSION · unknown

    NO CURRENT FIXED ROMANIAN END-OF-LIFE SYNTHETIC-TURF MATERIAL-RECYCLING FACILITY VERIFIED TO CTE PUBLIC-EVIDENCE STANDARD. Fixed turf-recycler pins: 0. General Sport Field is listed as a mobile pre-processor without a fixed pin (Bucharest and Dorohoi addresses are company / contact locations). Not pinned: SYNLawn (product / installer), FormaTurf (German, external), Eco Anvelope and ARCON (tyre system / technology), contractors and pitches. This does not mean Romania has no turf recycling — domestic fixed full-field recycling is simply not publicly verified to CTE standard.

  • CTE DATA GAP / AUDIT CONCLUSION · unknown

    Landscape, padel, tennis, multisport, school, minifootball and hybrid turf stock, EOL and recycling: UNKNOWN; not extrapolated from FRF / CNI football programmes. 'Recyclable', bio-based or PCR-content product claims are not evidence that recycling happened.

  • CTE DATA GAP / AUDIT CONCLUSION · unknown

    CTE has not identified a currently active Romanian fixed full-field synthetic-turf recycling facility that meets the CTE public-evidence standard. Verified counts: fixed full-field 0; fixed part-stream (carpet, fibres / backing, sand, performance infill) 0; mobile pre-processors 1 (General Sport Field). Generic plastics, construction or rubber recyclers do not qualify without turf-specific input evidence; installers and contractors are not recyclers.

  • FRF PROGRAMME PROJECT / LOCATION CONTEXT · official_source_verified

    Reghin (FRF, 6 May 2025): FRF supplied the artificial football playing surface; the municipality supplied land, changing facilities, floodlights, stands and other infrastructure. FRF states similar programme pitches were already completed in locations including Iași, Botoșani, Timișoara, Satu Mare, Râmnicu Sărat, Deva, Buftea, Piatra Neamț, Giurgiu, Brăila and Târgoviște. Location list — not a national inventory.

    Sources: [1] frf.ro

  • CTE DATA GAP / AUDIT CONCLUSION · unknown

    Individual replacement projects (Iclod 2026, UAIC 2023, TUIASI 2019) are never summed into national annual replacements. Further 2026 project-level examples mentioned in the brief (Foltești, Nădrag, Iași school, Segarcea) are not published in v1.0 because no primary procurement or municipal source URL was supplied.

  • CURRENT PROJECT / MAINTENANCE MATERIAL CONTEXT DURING TRANSITION · official_source_verified

    A 2026 Bucharest Sector 5 local-council document still includes SBR / EPDM granules as synthetic-turf infill / maintenance material. Project-specific transition-period context — no national infill share inferred.

    Sources: [1] hcl.usr.ro

  • CTE DATA GAP / AUDIT CONCLUSION · unknown

    Current verified national artificial-turf pitch count: UNKNOWN. Current verified national artificial-turf area: UNKNOWN. Romania has a substantial and expanding artificial-turf football base, but CTE has not identified a complete current public national census; no total is built from the FRF county programme, CNI sports bases, municipal, school, minifootball or private pitches.

  • CURRENT CNI ARTIFICIAL-TURF PROJECT EXAMPLE · official_source_verified

    Suceava (FRF, 26 April 2025): new CNI sports base with a synthetic pitch to UEFA dimensions and a 40 × 20 m multifunctional field; investment approximately EUR 1.1 million. Project value ≠ recycling cost.

    Sources: [1] frf.ro

  • COMPANY-REPORTED EXTERNAL RECYCLING ROUTE / PRODUCT CLAIMS · company_reported

    SYNLawn Romania (artificial-turf product / installation actor) states that, in collaboration with FormaTurf, it is able to recycle artificial turf 100% in Germany; it also makes recyclability, bio-based and PCR-content product claims. Company-reported external route and product-design claims — not Romanian recycling capacity or throughput, not a national Romania → Germany flow and not proof that every SYNLawn project goes to Germany. FormaTurf is a separate German actor: not pinned in Romania, its capacity is not Romanian.

    Sources: [1] synlawn.ro [2] synlawn.ro

  • HISTORICAL PROJECT-SPECIFIC REPLACEMENT AREA · official_source_verified

    Technical University Gheorghe Asachi, Iași (2019): replacement of 1,360 m² of artificial turf at a university sports base. Project-specific area — not a national average pitch size.

    Sources: [1] tuiasi.ro

  • HISTORICAL / RECENT PROJECT-SPECIFIC REPLACEMENT EVIDENCE · official_source_verified

    Alexandru Ioan Cuza University, Iași (2023): technical specification for replacement of a synthetic football-pitch surface. Project-specific — no national trend inferred.

    Sources: [1] uaic.ro

  • NATIONAL WASTE-CATALOGUE CONTEXT · official_source_verified

    The Romanian waste list (HG 856/2002) includes 17 02 03 plastics and 17 09 04 mixed construction and demolition waste. A universal Romanian EOL synthetic-turf waste code is NOT ESTABLISHED (coding is fraction-, origin- and process-specific), and turf-fraction End-of-Waste status is NOT GENERALLY VERIFIED — separated sand, cleaned infill or shredded polymer do not automatically cease to be waste.

    Sources: [1] legislatie.just.ro

  • CURRENT ROMANIAN NATIONAL WASTE FRAMEWORK · official_source_verified

    Emergency Ordinance (OUG) 92/2021 on the waste regime is the current national waste framework (prevention, reuse, recycling, recovery, disposal, traceability); it largely replaced Law 211/2011. No turf-specific facility permits are inferred.

    Sources: [1] legislatie.just.ro

All public sources (deduplicated) (21)

Each URL is listed once; the claim-source links above are preserved per statement.

  1. CNI — Anunț achiziție 1897 — Băneasa · achizitii.cni.ro · 1 statements
  2. ARCON Environmental — Tyre recycling · arcon-environmental.com.ro · 1 statements
  3. Eco Anvelope — Eco Anvelope · ecoanvelope.ro · 1 statements
  4. Eco Anvelope — Eco Anvelope — English · ecoanvelope.ro · 1 statements
  5. Eco Anvelope — Material recovery · ecoanvelope.ro · 1 statements
  6. EUR-Lex — Commission Regulation (EU) 2023/2055 · eur-lex.europa.eu · 1 statements
  7. FRF — La Dej a fost inaugurată baza sportivă cu numărul 40 (17 Mar 2025) · frf.ro · 2 statements
  8. FRF — O nouă bază sportivă modernă inaugurată la Suceava prin programul CNI (26 Apr 2025) · frf.ro · 1 statements
  9. FRF — Bază sportivă modernă inaugurată la Reghin (6 May 2025) · frf.ro · 1 statements
  10. FRF — O nouă bază sportivă inaugurată la Zalău (18 Aug 2026) · frf.ro · 1 statements
  11. Consiliul Local Sector 5 — HCL Sector 5 — 2026 · hcl.usr.ro · 1 statements
  12. legislatie.just.ro — OUG 92/2021 privind regimul deșeurilor · legislatie.just.ro · 1 statements
  13. legislatie.just.ro — HG 856/2002 — evidența gestiunii deșeurilor și lista deșeurilor · legislatie.just.ro · 1 statements
  14. General Sport Field — Mentenanță gazon · mentenanta-gazon.ro · 2 statements
  15. General Sport Field — Dezinstalare gazon artificial · mentenanta-gazon.ro · 2 statements
  16. Primăria Iclod — Contracte de achiziții — Înlocuire gazon sintetic Iclod Arena · primariaiclod.ro · 1 statements
  17. Primăria Iclod — Achiziții publice — documente de execuție · primariaiclod.ro · 1 statements
  18. SYNLawn Romania — SYNLawn Romania · synlawn.ro · 1 statements
  19. SYNLawn Romania — SYNLawn — public · synlawn.ro · 1 statements
  20. TUIASI — Caiet de sarcini — teren sport (2019) · tuiasi.ro · 1 statements
  21. UAIC Iași — Caiet de sarcini — lucrări teren fotbal (2023) · uaic.ro · 1 statements

12

CTE data quality

Claims

26

Sources

21

Claim-source links

24

Facilities

1

Official / regulatory sources

3

Last audited

2026-09-30

Final status: QA PASSED WITH DOCUMENTED UNKNOWN — QA PASSED — FROZEN (v1.0, 30 Sep 2026)