Skip to main content

Facilities

DECAMP (ACTECO-led, 2024–2026) — R&D / pilot turf recycling project (not a commercial facility)

spain

evidence.public_authority_reportedStatus: Project-specific operationLast verified: 2026-09-29
Missing value

Data completeness

0% complete
  • Verified GPS coordinates○ Missing
  • Rights-cleared photos○ Missing
  • Volume / capacity data○ Missing
  • Export / cross-border data○ Missing
  • Independently verified throughput○ Missing
  • Translations EN/NL/DE/FR○ Missing

Missing items are research gaps, not zero values.

Where does the material actually end up?

CTE Data noteCircular Turf Europe follows the material from input to final destination.

  1. 01Inputs
  2. 02Processes
  3. 03Outputs
  4. 04Final material destinations

Inputs

used artificial turf supplied for project tests (PE, PP, latex-containing backing, other fractions)

Processes

mechanical / physical separation (pilot / industrial-scale testing)

Outputs

facility_type

Final material destinations

facility_type → R&D / PILOT PHYSICAL RECYCLING PROJECT — NOT A VERIFIED COMMERCIAL FACILITY — NO STANDARD PIN

Recyclable

Under research

Actually recycled

Under research

Recycled into what?

Under research

Capacity

Capacity and throughput are separate claim types and are never added, averaged or converted.

Capacity claims

ValueTypeYearStatus / note
UNKNOWN

Throughput claims

ValueTypeYearStatus / note
UNKNOWN

Summary

Operator
ACTECO Productos y Servicios, S.L. (project lead)
Owner
Unknown
Location
Valencia-region R&D / pilot project — no standard facility location
Map location
Unknown
Country
spain
Permits
Unknown
Waste codes
Unknown
Cross-border acceptance
Unknown
Traceability
Under research

Sources

Source verification pending