Facilities
DECAMP (ACTECO-led, 2024–2026) — R&D / pilot turf recycling project (not a commercial facility)
spain
evidence.public_authority_reportedStatus: Project-specific operationLast verified: 2026-09-29
Missing value
Data completeness
0% complete- Verified GPS coordinates○ Missing
- Rights-cleared photos○ Missing
- Volume / capacity data○ Missing
- Export / cross-border data○ Missing
- Independently verified throughput○ Missing
- Translations EN/NL/DE/FR○ Missing
Missing items are research gaps, not zero values.
Where does the material actually end up?
CTE Data noteCircular Turf Europe follows the material from input to final destination.
- 01Inputs
- 02Processes
- 03Outputs
- 04Final material destinations
Inputs
used artificial turf supplied for project tests (PE, PP, latex-containing backing, other fractions)
Processes
mechanical / physical separation (pilot / industrial-scale testing)
Outputs
facility_type
Final material destinations
facility_type → R&D / PILOT PHYSICAL RECYCLING PROJECT — NOT A VERIFIED COMMERCIAL FACILITY — NO STANDARD PIN
Recyclable
Under research
Actually recycled
Under research
Recycled into what?
Under research
Capacity
Capacity and throughput are separate claim types and are never added, averaged or converted.
Capacity claims
| Value | Type | Year | Status / note |
|---|---|---|---|
| UNKNOWN | |||
Throughput claims
| Value | Type | Year | Status / note |
|---|---|---|---|
| UNKNOWN | |||
Summary
- Operator
- ACTECO Productos y Servicios, S.L. (project lead)
- Owner
- Unknown
- Location
- Valencia-region R&D / pilot project — no standard facility location
- Map location
- Unknown
- Country
- spain
- Permits
- Unknown
- Waste codes
- Unknown
- Cross-border acceptance
- Unknown
- Traceability
- Under research
Sources
Source verification pending