Skip to main content

Facilities

GBN-AGR Amsterdam

Amsterdam, netherlands

Company reportedStatus: OperationalLast verified: 2026-09-28
Company-reported

Data completeness

33% complete
  • Map location: geocoded from official regulatory address✓ Available
  • Rights-cleared photos○ Missing
  • Volume / capacity data✓ Available
  • Export / cross-border data○ Missing
  • Independently verified throughput○ Missing
  • Translations EN/NL/DE/FR○ Missing

Missing items are research gaps, not zero values.

Description

Founded in April 2019 by GBN together with turf producers; production started in spring 2021. Company-reported target for the first production year was 1.5 million metres of turf. No independently verified throughput was found. Acquired by RNW Capital in January 2025.

Where does the material actually end up?

CTE Data noteCircular Turf Europe follows the material from input to final destination.

  1. 01Inputs
  2. 02Processes
  3. 03Outputs
  4. 04Final material destinations

Inputs

sport, end-of-life synthetic turf (infill + carpet)

Processes

delivery to Amsterdam, infill removal / separation, washing / cleaning, turf carpet shredding, separation / cleaning, production of recycled turf agglomerate (RTA)

Outputs

Recycled sand (company reported); Recycled rubber (company reported); Recycled turf agglomerate (RTA) (company reported)

Final material destinations

Recycled sand → reuse as infill; drainage sand; Recycled rubber → industrial flooring; green-roof panels; Recycled turf agglomerate (RTA) → plastic hockey edge boards; picnic-table components; sports-technical base layers; other recycled plastic products

Recyclable

Under research

Actually recycled

Under research

Recycled into what?

Under research

Capacity

Capacity and throughput are separate claim types and are never added, averaged or converted.

Capacity claims

ValueTypeYearStatus / note
UNKNOWNCONFLICTING PUBLIC CAPACITY CLAIMS2026current — CURRENT 2026 CAPACITY: UNKNOWN — CONFLICTING PUBLIC CAPACITY CLAIMS
2,000,000 m²/yearPUBLIC SOURCE REPORTED CAPACITY—conflicting — PUBLICLY REPORTED CAPACITY CLAIM (UBA)
70,000 t/yearSOURCE REPORTED EQUIVALENT—conflicting — SOURCE-REPORTED MASS EQUIVALENT of the 2,000,000 m² claim — not a CTE conversion, not throughput
500,000 m²/yearINDUSTRY REPORTED CAPACITY2023conflicting — ESTC 2023 INDUSTRY-REPORTED CAPACITY CLAIM

Throughput claims

ValueTypeYearStatus / note
UNKNOWNUNKNOWN2026current — Actual throughput UNKNOWN

CURRENT 2026 CAPACITY: UNKNOWN — CONFLICTING PUBLIC CAPACITY CLAIMS. Claim A: 2,000,000 m²/year — PUBLICLY REPORTED CAPACITY CLAIM (UBA; source-reported mass equivalent ≈70,000 t/year — not a CTE conversion, not throughput). Claim B: 500,000 m²/year — ESTC 2023 INDUSTRY-REPORTED CAPACITY CLAIM. Neither chosen, not averaged. Actual throughput: UNKNOWN.

Summary

Operator
Artificial Grass Recycling B.V. / GBN-AGR
Owner
Unknown
Location
Santoriniweg 20, 1045 AV Amsterdam, Netherlands
Map location
COMPANY-CONFIRMED FACILITY LOCATION — GEOCODED
Country
netherlands
Permits
Unknown
Waste codes
Unknown
Cross-border acceptance
Unknown
Traceability
Output end markets are company-reported unless stated otherwise; final destinations not independently verified.

Sources

Source verification pending