IFE Aufbereitungstechnik — Waidhofen an der Ybbs (March 2026 infill project)
Waidhofen an der Ybbs, austria
Data completeness
17% complete- Verified GPS coordinates○ Missing
- Rights-cleared photos○ Missing
- Volume / capacity data○ Missing
- Export / cross-border data○ Missing
- Independently verified throughput○ Missing
- Translations EN/NL/DE/FR✓ Available
Missing items are research gaps, not zero values.
Description
In March 2026 IFE (machinery / separation-technology company) physically processed used artificial-turf infill from several Big Bags in its technical centre: screening, then density separation of rubber granulate from sand. The cleaned granulate could be reused as infill (reuse, not material recycling). Project-specific / demonstration case — annual capacity and throughput UNKNOWN; not counted as a commercial recycler.
Where does the material actually end up?
CTE Data noteCircular Turf Europe follows the material from input to final destination.
- 01Inputs
- 02Processes
- 03Outputs
- 04Final material destinations
Inputs
used artificial-turf infill (rubber granulate + sand, with fibres and contaminants), several Big Bags
Processes
linear vibrating screen (removal of fibres, leaves, branches, contaminants), IFE SORT density separation (vibration + air flow): rubber granulate / sand
Outputs
cleaned rubber granulate (municipal source); separated sand (municipal source)
Final material destinations
cleaned rubber granulate → suitable for direct reuse as artificial-turf infill (REUSE — not material recycling)
Recyclable
Under research
Actually recycled
Under research
Recycled into what?
Under research
Capacity
Capacity and throughput are separate claim types and are never added, averaged or converted.
Capacity claims
| Value | Type | Year | Status / note |
|---|---|---|---|
| UNKNOWN | UNKNOWN | 2026 | current — Annual synthetic-turf processing capacity UNKNOWN / NOT APPLICABLE AS COMMERCIAL FACILITY — project-specific March 2026 case; "several Big Bags" not converted to tonnes |
Throughput claims
| Value | Type | Year | Status / note |
|---|---|---|---|
| UNKNOWN | UNKNOWN | 2026 | current — Annual turf throughput UNKNOWN; project quantity "several Big Bags" — not converted, not estimated |
Summary
- Operator
- IFE Aufbereitungstechnik GmbH
- Owner
- Unknown
- Location
- Waidhofen an der Ybbs, Austria (technical centre / Technikum; no pin — project-specific)
- Map location
- Unknown
- Country
- austria
- Permits
- Unknown
- Waste codes
- Unknown
- Cross-border acceptance
- Unknown
- Traceability
- Municipal source (Waidhofen an der Ybbs, 3 April 2026).