Facilities
Infrasports
Creutzwald, france
Data completeness
33% complete- Map location: geocoded from official regulatory address✓ Available
- Rights-cleared photos○ Missing
- Volume / capacity data○ Missing
- Export / cross-border data○ Missing
- Independently verified throughput○ Missing
- Translations EN/NL/DE/FR✓ Available
Missing items are research gaps, not zero values.
Description
Active synthetic-surface recycling / treatment platform, regulatory authorisation confirmed (arrêté préfectoral n°2025-DCAT/BEPE-85, 28 February 2025). Site operated since 2019 (approx. 2.4 ha). Reuse screening first; non-reusable turf is separated into recoverable materials (e.g. sand, PE, PP); non-recoverable waste goes to external treatment or energy recovery. A 98% recycling rate is a company/project-reported estimate reproduced in a 2024 local-authority document, not independently measured. Capacity and throughput unknown. Company headquarters (Leyviller) is not the facility location.
Where does the material actually end up?
CTE Data noteCircular Turf Europe follows the material from input to final destination.
- 01Inputs
- 02Processes
- 03Outputs
- 04Final material destinations
Inputs
Unknown
Processes
reuse screening, separation of constituents, material recovery, storage, external treatment / energy recovery for non-recoverable fractions
Outputs
reusable turf (public authority document); sand (public authority document); polyethylene (public authority document); polypropylene (public authority document); non-recoverable waste (public authority document)
Final material destinations
reusable turf → resold / reused (REUSE, not recycling); non-recoverable waste → external treatment or energy recovery
Recyclable
Under research
Actually recycled
Under research
Recycled into what?
Under research
Capacity
Capacity and throughput are separate claim types and are never added, averaged or converted.
Capacity claims
| Value | Type | Year | Status / note |
|---|---|---|---|
| UNKNOWN | UNKNOWN | 2026 | current — Capacity UNKNOWN |
| 25 t/hour | INDUSTRY REPORTED CAPACITY | 2023 | historical — DATED 2023 INDUSTRY-REPORTED PROCESSING RATE (ESTC 2023) — not current 2026 capacity, not annual capacity, not actual throughput, not converted to t/year. >100 fields/year = 2023 forward-looking expectation, not throughput. |
Throughput claims
| Value | Type | Year | Status / note |
|---|---|---|---|
| UNKNOWN | UNKNOWN | 2026 | current — Actual throughput UNKNOWN |
Annual synthetic-turf processing capacity: UNKNOWN. The 2025 authorisation confirms treatment is authorised but gives no comparable annual turf tonnage.
Summary
- Operator
- Infrasports
- Owner
- Unknown
- Location
- Processing facility: Siège 2 La Houve, Route Forestière de Ham, 57150 Creutzwald, France · Company/contact address: 1 rue des Alouettes, 57660 Leyviller, France
- Map location
- OFFICIAL FACILITY LOCATION — GEOCODED FROM REGULATORY ADDRESS
- Country
- france
- Permits
- Arrêté préfectoral n°2025-DCAT/BEPE-85, 28 February 2025 (2791-1, 2716-1)
- Waste codes
- Unknown
- Cross-border acceptance
- Unknown
- Traceability
- Output end markets are company-reported unless stated otherwise; final destinations not independently verified.
Regulatory evidence
- 2025 prefectural authorisation for the Creutzwald processing site Official source
- DREAL inspection carried out in January 2026 Official source
Sources
- 2025 prefectural authorisation for the Creutzwald processing siteOfficial source