Skip to main content

Facilities

JNC Premier Pitches (J.N. Cummins & Co. Ltd.) — mobile / project-based pre-processor

Cashel, ireland

Company reportedStatus: OperationalLast verified: 2026-09-29
Missing value

Data completeness

17% complete
  • Verified GPS coordinates○ Missing
  • Rights-cleared photos○ Missing
  • Volume / capacity data○ Missing
  • Export / cross-border data○ Missing
  • Independently verified throughput○ Missing
  • Translations EN/NL/DE/FR✓ Available

Missing items are research gaps, not zero values.

Description

Mobile / project-based pre-processor: removes and separates old turf and infill during resurfacing; company base Cashel (text only, no pin). Capacity and throughput UNKNOWN; downstream final processor UNKNOWN / project-specific.

Where does the material actually end up?

CTE Data noteCircular Turf Europe follows the material from input to final destination.

  1. 01Inputs
  2. 02Processes
  3. 03Outputs
  4. 04Final material destinations

Inputs

end-of-life synthetic turf (mat + infill) removed during resurfacing

Processes

removal of old turf and infill (SMG Turf Muncher), separation of old materials

Outputs

facility_type

Final material destinations

facility_type → MOBILE PRE-PROCESSOR / PITCH-RESURFACING MATERIAL-SEPARATION ACTOR — NOT A FULL-FIELD MATERIAL RECYCLER — NO FIXED FACILITY PIN

Recyclable

Under research

Actually recycled

Under research

Recycled into what?

Under research

Capacity

Capacity and throughput are separate claim types and are never added, averaged or converted.

Capacity claims

ValueTypeYearStatus / note
UNKNOWN

Throughput claims

ValueTypeYearStatus / note
UNKNOWN

Summary

Operator
J.N. Cummins & Co. Ltd. t/a JNC Premier Pitches
Owner
Unknown
Location
Mayfield, Cashel, Co. Tipperary, E25 TD32 (company base — mobile / project-based processing)
Map location
Unknown
Country
ireland
Permits
Unknown
Waste codes
Unknown
Cross-border acceptance
Unknown
Traceability
Under research

Sources

Source verification pending